Similar Projects
Academica K - 12 Charter School
New Construction
Conception
Royal Palm Beach, FL 33411

Melaleuca Elementary School Modernization CM at Risk Services
New Construction, Renovation - 83,000 SF
Design
$19,850,000 est. value
West Palm Beach, FL 33415

CM at Risk for Renovations and Repair at Limestone Creek Elementary School
Renovation
Design
Less than $3,948,000 est. value
Jupiter, FL 33458

Contractor Prequalification Program
Term Contract
Bidding
FL

Construction Management Services for Renovations and Repair at Omni Middle School and Whispering Pines Elementary School
Renovation
Bidding
$11,351,658 est. value
Boca Raton, FL 33496

South Olive Elementary School
Post-Bid
West Palm Beach, FL 33405

North Grade Elementary School
Post-Bid
Lake Worth, FL 33460

Core Expansion at Del Prado Elementary School
Results
Less than $2,690,000 est. value
Boca Raton, FL 33433

Modular Classroom Relocation - Various Sites
Term Contract
Results
$500,000 est. value
FL

Construction Management at Risk Services for Facilities Renovations and Repair
Renovation
Construction
$4,526,923 to $4,712,783 est. value
Lantana, FL

Washington Elementary School Modernization
Construction
West Palm Beach, FL 33404

CM at Risk for Renovations and Repair at Lake Park Elementary School
Renovation
Design
Less than $3,274,564 est. value
Lake Park, FL 33403

Construction Management at Risk Services Facilities Renovations and Repair - Sandpiper Shores ES and Waters Edg ES
Renovation
Bidding
$8,555,398 est. value
Boca Raton, FL 33428

Citrus Cove Elementary School Core Expansion
Post-Bid
Less than $2,690,000 est. value
Boynton Beach, FL 33436

Grove Park Elementary School
Results
$16,560,000 est. value
Palm Beach Gardens, FL 33410

Last Updated 08/27/2021 01:53 PM
Project Title

Construction Management for Facilities Renovation and Repair - Liberty Park/Highland Elementary School

Physical Address View project details and contacts
City, State (County) Greenacres, FL 33413   (Palm Beach County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Preconstruction Phase Services necessary to establish a GMP as well as all Construction Phase Services following Award of the GMP for each school identified in this Project Notification. The Construction Manager may be required to complete portions of the construction on an occupied campus as directed by the Owner. The Construction Manager shall provide deferred maintenance, renovation and repairs to school facilities which may include, but not limited to, ADA and CSIR compliance requirements, replacement of exterior doors and windows, roof repair, upgrades to the intercom/sound system, security system, fire alarm system, HVAC system, lighting replacement (interior and exterior), paving and play court resurfacing, marquees and scoreboards, plumbing work, bathroom replacements, ceiling and flooring replacements, interior finishes/painting/casework, and other Work as may be required by the Owner. Budget Liberty Park $5,786,987 Highland Elementary School 4,681,382

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents