Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

HVAC Replacements
Post-Bid
Salisbury, NC

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Frank Porter Graham Elementary School - Intermediate & Media Buildings Hvac Replacement
Results
Chapel Hill, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - HVAC System
Results
Cullowhee, NC 28723

PC Air Units
Post-Bid
Charlotte, NC 28208

Chancellor's Residence HVAC Renovation
Results
Chapel Hill, NC 27514

Chiller Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Install 10 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

Hope Mills and South View Middle School Gymnasium HVAC Renovation Project
Results
Hope Mills, NC 28348

Reported 05/09/2020 12:00 AM
Project Title

Furnish, Deliver and Install a Trane at CGAM 60-Tom Replacement Chiller for the Bullock Building at Lenoir Community College

Physical Address View project details and contacts
City, State (County) Kinston, NC 28504   (Lenoir County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. The replacement of the chiller shall include disconnecting the existing chilled water piping and removing the old chiller. B. The existing equipment pad needs to be extended approximately 24”. C. The new chiller shall be installed on the existing concrete pad. D. The new chiller shall be connected to the existing chilled water pipe, providing new piping, valves, strainer, fittings, and insulation as required. E. The new chiller shall be connected to existing control system and controlled as currently set-up. F. The new chiller shall include a Bacnet card for integration into the control system. G. All new chilled water piping shall be heat traced. H. Work shall also include fusing the existing disconnect switch to match the chiller rating and re-working the circuit as required.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents