Similar Projects
PRESOLICITATION NOTE - Design-Bid-Build (Dbb), Dry Dock 2, Portal Crane Rail And Tunnel Repairs located at Portsmouth Naval Shipyard in Kittery, ME.
Design
$10,000,000 est. value
Kittery, ME 03854

Main Floats Reconstruction
Bidding
Bucksport, ME 04416

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Isles of Shoals Harbor of Refuge, NH & ME
Post-Bid
$5,000,000 to $10,000,000 est. value
Concord, MA - Cape Elizabeth, ME - Rye, NH

Y--P-310 Dry Dock 1 Super Flood Basin and P-1074 Extend Portal Crane at Portsmouth Naval Shipyard in Kittery, ME
Results
$100,000,000 to $250,000,000 est. value
Kittery, ME

Selective Pier Deck Replacement
Results
Lincolnville, ME

Shipyard Services
Post-Bid
Portland, ME

14’ X 30’ Heavy Duty Float
Results
Lincolnville, ME

Wharf Reconstruction Improvements
Results
Tremont, ME 04653

DMC Pier Replacement
Results
Walpole, ME 04573

Development and Installation of New Floats
Results
Belfast, ME

DD2 Portal Crane and Tunnel Repairs
Results
Kittery, ME

Androscoggin River Boat Launch Improvements
Results
Rumford, ME

Cook's Point Boat Ramp Improvement Project
Results
Old Town, ME 04468

Mitchell Field Town Landing
Results
Less than $284,000 est. value
Harpswell, ME 04079

Last Updated 01/08/2020 08:41 AM
Project Title

Waterfront Repairs, U.S. Coast Guard Station Southwest Harbor, Me (Hancock County)

Physical Address View project details and contacts
City, State (County) Southwest Harbor, ME 04679   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to replacing steel guide pile strut, modifying gangway guardrail, cleaning and recoating steel guide piles, installing rub strips on gangway, replacing guide pile anodes, and refastening gangway platform connection hardware on the West Floating Dock; cleaning and recoating steel guide piles and struts, installing membrane on underside of float, replacing guide pile anodes, and refastening gangway treads on the South Floating Dock; cleaning and recoating steel sheet piles and mooring hardware, repairing voids and missing chinking with grout packets, and repairing spalls and concrete disintegration on the Retaining Wall and Quaywall; cleaning and recoating mooring hardware, encasing timber piles and replacing pile encasements, replacing deteriorated bracing connections, replacing timber brace members, repairing concrete spalls, delamination, and cracks, replacing expansion joint filler material, and replacing the fender system on the Concrete Wharf; cleaning and recoating steel H-Piles and mooring hardware, replacing timber wave screen members, refastening wave screen bracket, and replacing H-pile anodes on the Boat Hoist Piers

Details

Division 31 - Earthwork, Special Foundations, Helical Foundation Piles.
Division 32 - Exterior Improvements, Retaining Walls.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment, Marine Specialties, Mooring Devices, Laser Docking Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents