Similar Projects
2020 Drainage Program Survey, Design and Permitting Services
Conception
Barrington, IL 60010

Streambank Stabilization on Calumet Union Drainage Ditch
Bidding
$2,351,738 to $2,846,840 est. value
Markham, IL 60428

West Woodlawn Sewer Improvement
Bidding
Chicago, IL 60637

Catch Basin and Inlet Cleaning 2020-2021
Term Contract
Post-Bid
Mount Prospect, IL 60056

FY21 Sanitary and Storm Sewer Closed Circuit Television (CCTV)
Term Contract
Post-Bid
Niles, IL 60714

Manhole Cleaning
Results
Palos Park, IL 60464

2020 Manhole Rehabilitation
Results
$337,726 to $359,476 est. value
Elk Grove Village, IL 60007

East Garfield Park Sewer Improvement
Bidding
Chicago, IL

Residential Flood Control System Installation
Post-Bid
Skokie, IL

2020 Sanitary Sewer Inspection and Rehabilitation
Results
Oak Lawn, IL 60453

Busse Road CIPP Sanitary Sewer Rehabilitation
Bidding
Elk Grove Village, IL

Culvert Repairs
Post-Bid
Palos Hills, IL 60465

Removal and Replacement of an Existing 32-Foot Long 18" X 24" Culvert With A Proposed 48-Foot Long 36" X 72" Cast in Place Culvert (Proposed SN 016-2272)
Results
IL

2021 Clean and CCTV Sanitary Sewers
Bidding
Palos Heights, IL

Village Wide Emergency Water and Sewer Repair Work
Term Contract
Post-Bid
Oak Park, IL

Last Updated 07/07/2020 10:29 AM
Project Title

I-20-4537 - I-490 Compensatory Storage Construction

Physical Address View project details and contacts
City, State (County) IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location The work under this contract is to be performed on: Tri-State Tollway (I-294) between Mile Post 35.0 and Mile Post 35.2 in Cook County, Illinois (Cook). The scope of the work shall consist of construction of a sanitary sewer, abandoning and filling an existing sanitary sewer, excavation and grading compensatory storage area for Addison Creek, erosion control measures, landscape improvements and protection of existing utilities on the Murnane property.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents