Similar Projects
US 41/SR 45 Retaining Wall Replacement
Infrastructure
Bidding
$371,200 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Pipe Cleaning Drainage Systems
Results
Less than $65,000 est. value
FL

Sports Field Drainage Project, Tournament Sportsplex
Results
Tampa, FL 33619

Trench Drain System
Infrastructure
Post-Bid
Tampa, FL

Public Safety Operations Complex Pond Maintenance
Results
Less than $200,000 est. value
Tampa, FL 33619

Drainage Project of Lake Magdalene and Roosevelt Elementary Schools
Term Contract
Post-Bid
Tampa, FL 33612

2018 Kracker Avenue Restoration Project
Results
Less than $1,458,007 est. value
Gibsonton, FL 33534

Riverhill Elementary Drainage Project
Infrastructure
Post-Bid
Temple Terrace, FL 33617

Grading - Gibsonton Tract Mitigation Site
Infrastructure
Results
$3,159,800 est. value
FL

Drainage In Field Corridors, Tournament Sportsplex
Infrastructure
Results
Tampa, FL 33619

Grading - US 92 - Drainage Improvements
Infrastructure
Results
$3,693,800 est. value
Seffner, FL 33584

Milling and Resurfacing/Shoulder Widening/Drainage Improvements-SR 39 (Paul s Buchman Hwy)
Infrastructure
Results
$13,282,900 est. value
FL

SR 574 - Drainage Improvements
Infrastructure
Results
$248,200 est. value
FL

Last Updated 02/11/2022 07:55 AM
Project Title

Edward Medard Toe Drain Replacement

Physical Address View project details and contacts
City, State (County) Plant City, FL 33567   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work will generally involve two phases of construction (Phase 1, North Toe Drain and Phase 2, South Toe Drain), including construction of vertical pressure relief wells connected to a new embankment underdrain system on the north side of the principal spillway discharge channel, and a similar pressure relief well and underdrain system on the south side of the principal spillway discharge channel. Both underdrain systems will require the removal of the existing underdrains, modifications of existing manholes, and the installation of a new manhole and associated pump and piping.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents