Similar Projects
Last Updated | 02/11/2022 07:55 AM |
Project Title | Edward Medard Toe Drain Replacement |
Physical Address | View project details and contacts |
City, State (County) | Plant City, FL 33567 (Hillsborough County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project work will generally involve two phases of construction (Phase 1, North Toe Drain and Phase 2, South Toe Drain), including construction of vertical pressure relief wells connected to a new embankment underdrain system on the north side of the principal spillway discharge channel, and a similar pressure relief well and underdrain system on the south side of the principal spillway discharge channel. Both underdrain systems will require the removal of the existing underdrains, modifications of existing manholes, and the installation of a new manhole and associated pump and piping. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |