Similar Projects
Site 114-E-W-4 New Relief Elementary
Conception
$29,100,000 est. value
Orlando, FL 32809

Site 45-M-SE-2 Middle School
New Construction
Conception
$46,700,000 est. value
Orlando, FL 32827

Site 73-T-W-7 School Replacement
New Construction - 150,289 SF
Design
$38,800,000 est. value
Ocoee, FL 34761

Construction Management at Risk Services for Dommerich Elementary School and Maitland Middle School Multi-System Capital Renewal Project
Renovation
Bidding
$6,619,000 est. value
Maitland, FL 32751

Castle Creek Elementary School
Renovation
Sub-Bidding
Orlando, FL 32828

Catalina Elementary School
Renovation
Sub-Bidding
Orlando, FL 32805

Pinar Elementary School Comprehensive/Replacement Project Stormwater Revisions
New Construction, Renovation - 85,201 SF
Post-Bid
Less than $12,700,000 est. value
Orlando, FL 32800

Bonneville Elementary School Campuswide - Phase I
Post-Bid
$1,900,000 est. value
Orlando, FL 32826

Construction Manager at Risk Services for Site 132-M-W-4 Middle School and Site 89-E-W-4 Elementary School Projects
New Construction
Results
Less than $57,000,000 est. value
Orlando, FL 34787

Disaster Recovery Services
Results

Islamic Center of Orlando
New Construction, Addition - 26,000 SF
Construction
$3,947,330 est. value
Orlando, FL

Riverdale Elementary School and Lakeville Elementary School Capital Renewal Projects
Construction
Orlando, FL 32817

Citrus Elementary School
Renovation
Sub-Bidding
Ocoee, FL 34761

Ocps-Sy2020-21 16-Site Portable Project
Renovation, Term Contract
Post-Bid
Orlando, FL

Site 30-E-SE-3 Elementary
New Construction
Results
$27,200,000 est. value
Orlando, FL 32801

Last Updated 01/19/2022 10:04 AM
Project Title

Construction Management at Risk Services for Tildenville Elementary School Multi-System Capital Renewal Project

Physical Address View project details and contacts
City, State (County) Winter Garden, FL 34787   (Orange County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,693,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. A Multi-System Capital Renewal project at Tildenville Elementary School located at 1221 Brick Rd., Winter Garden, FL 34787. 2. Campus-wide HVAC, lighting, plumbing, low-voltage and technology system renovations, including but not limited to: refurbishment or replacement of existing air-handling units and the addition of bi-polar ionization; conversion of buildings 300 and 400 to a chilled water system; replacement of remaining building and central energy plant equipment, resized in conjunction with the addition of bi-polar ionization and the building conversions; new building automation system (BAS); replacement of exterior pole and wall mounted fixtures; retrofit or replacement of remaining interior and exterior light fixtures to LED technology; water heater replacements and sanitary lift station repairs; repair and recertification of the existing lightning protection system; replacement of exterior fire alarm devices and recertification of the fire alarm system; intercom, intrusion detection, and security camera system replacements and upgrades; and replacement of the network fiber backbone and cabling for wireless access points. The OCPS LDB participation goal for this project is 10%. The OCPS VBE goal is 3% Join from the meeting link: https://ocps.webex.com/ocps/j.php?MTID=mccbf908a1beedc9d6772f1a77ed9c282 Join from a dial in number: Toll Free 1-415-655-0001 Access Code 2322 214 5430

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents