Similar Projects
Canopy Building Sprinkler System
Renovation
Sub-Bidding
$500,000 CJ est. value
Neosho, MO 64850

230126 Hybrid Fire Panel
Renovation
Sub-Bidding
$20,000 CJ est. value
Camdenton, MO 65020

ASRC, Fine Arts & Physics Buildings Replace Fire Alarms
Post-Bid
$306,000 to $340,000 est. value
Columbia, MO 65211

Fire Extinguisher Maintenance
Term Contract
Post-Bid
Warrenton, MO

Whiteman AFB 6th Year Fire Extinguisher Maintenance
Term Contract
Results
Whiteman Air Force Base, MO

Install Fire Alarm System
Alteration
Results
Saint Joseph, MO 64506

Fire System
Alteration
Post-Bid
Lexington, MO

Replace Fire Sprinkler System - Northwest Missouri Psychiatric Rehab Center
Alteration
Results
Jefferson City, MO

Saint Louis VAMC Fire Extinguisher Inspection and Certification
Term Contract
Post-Bid
Jacksonville, Shiloh, IL - Creve Coeur, Florissant, O'Fallon, Saint Louis, Washington, MO 63110

Sprinkler and Fire Alarm Testing 2022
Term Contract
Results
MO

Fire Extinguisher Inspection Services
Term Contract
Post-Bid
Excelsior Springs, Kansas City, Kearney, Liberty, Smithville, MO 64068

Welcome Center Fire or Burglar Alarm System Replacement
Alteration
Results
Coffman, MO 63670

Fire Systems Inspections
Term Contract
Post-Bid
North Kansas City, MO

OTC Sprinkler Modifications
Alteration
Results
Springfield, MO 65802

Fire Alarm Monitoring, Maintenance and Repair
Term Contract
Post-Bid
Grain Valley, MO

Last Updated 01/18/2023 01:39 PM
Project Title

Replace Dry Pipe Sprinkler System Northwest Missouri Psychiatric Rehabilitation Center - Rebid

Physical Address View project details and contacts
City, State (County) Saint Joseph, MO 64506   (Buchanan County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $381,186 [brand] Estimate
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes demolishing existing dry pipe sprinkler system in the attic space including but not limited to piping, fittings, hangers, sprinklers, dry pipe valves, butterfly valves, and related devices in the riser room. New dry pipe sprinkler system(s) shall be provided, including new grooved butterfly valves, dry pipe valves, and all other components for new working dry system(s). Air supply shall be provided with a nitrogen generator set capable of supporting entire dry system(s) for the attic Replace Dry Pipe Sprinkler System at Northwest Missouri Psychiatric Rehabilitation Center This Section includes requirements for infection control in environments that Clients are housed in, dine in, or participate in program activities in or adjacent to the Scope of Work area 1. The Contractor shall have the applicable measures specified below in-place any time demolition or construction activities occur in occupied or non-occupied project work areas. 2. The Contractor shall complete all specified cleaning procedures and receive clearance from the Construction Representative prior to removing any barriers and other precautionary measures even for areas that the Clients do not occupy during construction. The contract performance time is 150 working days from the transmittal date of this agreement. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents