Similar Projects
Burns/Mather/ Cross Water Line Design And Construction - 6064-2020-04 - City of McCall
Infrastructure
Conception
$950,000 CJ est. value
McCall, ID 83638

Burns/Mather/ Cross Water Line Design And Construction - 6064-2020-04 - City of McCall
Infrastructure
Conception
$950,000 CJ est. value
McCall, ID 83638

2nd Street Mixed-Use
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
McCall, ID 83638

Maverik / McCall
Demolition, New Construction, Infrastructure - 5,041 SF
Design
$3,000,000 CJ est. value
McCall, ID 83638

McCall Field Campus
New Construction, Infrastructure
Post-Bid
$39,440,000 CJ est. value
McCall, ID 83638

Yellow Pine Waterline Replacement Project
Infrastructure
Post-Bid
$290,000 est. value
Yellow Pine, ID

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Infrastructure
Results
$500,000 to $1,000,000 est. value
Cascade, ID 83611

For the Work of Rehabilitating the Roadway on SH-55 between MP 101.545 and 108
Infrastructure
Results
ID

Krahn Lane Self-Storage / McCall
New Construction, Infrastructure - 30,050 SF
Pending Verification
$3,200,000 CJ est. value
McCall, ID 83638

Quaker Hill Conference Center Renovation / McCall
Addition, Demolition, Renovation, Infrastructure - 9,752 SF
Pending Verification
$800,000 CJ est. value
McCall, ID 83638

Wooley Avenue Reconstruction - City of McCall
Infrastructure
Conception
$1,625,000 CJ est. value
McCall, ID 83638

Apron Construction - Rehabilitate Hangar Taxiways - 2956-2018-07 - City of McCall
Renovation, Infrastructure
Design
$950,000 CJ est. value
McCall, ID 83638

Lift Station 52 Bypass Project
Infrastructure
Post-Bid
$850,000 CJ est. value
McCall, ID 83638

Reconstruct Taxiway E McCall Municipal Airport
Infrastructure
Results
$617,583 CJ est. value
McCall, ID 83638

Big Horn Residential Development
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
McCall, ID 83638

Last Updated 01/04/2024 09:33 AM
Project Title

1st Street, Phase 3B Surface Improvements Project

Physical Address View project details and contacts
City, State (County) McCall, ID 83638   (Valley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $2,336,083 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 4, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** All questions or requests for additional information must be submitted in writing to the City engineering consultant, through the or via email, no later than 5:00 pm on Monday, 10/30/23. Please contact Karie Gullickson at karieg@horrocks.com with any project related questions. The City of McCall reserves the right to reject any or all proposals. This is a Davis Bacon Federally funded project. The work of this contract generally includes roadway improvements on 1st Street from Park Street to Lake Street (SH-55). These roadway improvements will include a full-depth reconstruction of the existing roadway as well as the installation of stormwater inlets, curb, gutter, sidewalk, light poles and electrical system, striping, irrigation system, and landscaping. The project also includes full-depth reconstruction of the 1st St parking lot to include striping, lighting and electrical, landscaping, and storm water improvements. It is expected that the project will be substantially complete on or before 10/4/24 Question Deadline 10/30/2023 at 5:00 PM MT All questions or requests for additional information must be submitted in writing to the City engineering consultant, through the Horrocks or via email, Please contact Karie Gullickson at karieg@horrocks.com with any project related questions.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents