Similar Projects
Hwy 55 Burgers Shakes & Fries
New Construction
Conception
Zebulon, NC

McDonald's
New Construction, Demolition
Conception
Charlotte, NC 28213

Vermillion Village
New Construction - 10,000 SF
Design
Huntersville, NC 28078

Grand Lake Village
New Construction
Design
Charlotte, NC 28208

Trinity Oaks Dining Room
Renovation - 3,122 SF
Bidding
Salisbury, NC 28144

Panera Bread #1137
Build-Out - 4,381 SF
Post-Bid
Indian Trail, NC 28079

Chipotle #3693
Build-Out - 2,400 SF
Post-Bid
Wilson, NC 27895

Fayetteville Regional Airport Kitchen Upfit
Results
Less than $510,657 est. value
Fayetteville, NC 28306

Purchase and Redevelopment of Town-Owned Real Estate
Results
Waxhaw, NC 28173

Melting Pot Social
Renovation - 3,600 SF
Construction
Asheville, NC

Famous Toastery
Renovation - 4,750 SF
Construction
$200,000 est. value
Concord, NC 28025

McDonald's
New Construction
Conception
Charlotte, NC 28215

Waters Edge at University Place - Phase 1
New Construction - 182,000 SF
Design
$10,000,000 CJ est. value
Charlotte, NC 28262

ABC Store Suite 102 Upfit Westwood Shopping Center
Build-Out - 7,750 SF
Post-Bid
Fayetteville, NC 28301

Corolla ABC Store
New Construction - 6,345 SF
Results
Corolla, NC 27929

Reported 09/24/2021 03:00 PM
Project Title

Marco's Pizza #8592

Physical Address View project details and contacts
City, State (County) Carthage, NC   (Moore County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method
Project Status Building in Operation as of September 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Food/Beverage Service, 1 Story Above Grade, 1,344 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents