Similar Projects
Town Branch Scum Facility Improvements
Renovation, Alteration
Bidding
Lexington, KY 40504

Town Branch Scum Facility Improvements
Renovation, Alteration
Bidding
Lexington, KY 40504

Carrier I-VU HVAC Control System
Post-Bid
Fort Wright, KY

High Voltage Building Uninterruptable Power Supply (UPS) Replacement
Post-Bid
Erlanger, KY

Purchase and Installation of 5 New Insulated Bay Doors (R-Rating)
Results
Dayton, KY

HVAC Preventative Maintenance, NWS Paducah, KY
Results
Paducah, KY

Central Lab Air Handler Replacement (Rooftop Exhaust)
Alteration
Bidding
$1,457,840 est. value
Frankfort, KY 40601

Sawyer Hayes Conference Center Chiller Replacement
Renovation
Post-Bid
Less than $434,149 est. value
Louisville, KY 40241

Walton Verona High School Rooftop Equipment
Results
Walton, KY 41094

GCHS Football Field Bleachers and Press Box Replacement - BP 2
Alteration
Bidding
Leitchfield, KY

Fire Department Vehicle Exhaust Extraction System
Post-Bid
Fort Mitchell, KY 41017

Replacement of Power Monitoring and Control System
Results
Erlanger, KY

Electrical Supplies and Lighting (Line Item)
Alteration
Bidding
KY

Hazelwood HVAC System Replacement
Post-Bid
Less than $48,000 est. value
Louisville, KY

Replace Basement Windows at Golden Tower With Some Limited Acoustical Ceiling and HVAC Work
Results
Covington, KY

Reported 10/01/2021 12:00 AM
Project Title

Caverna Independent Schools Secure Entrance Improvements

Physical Address View project details and contacts
City, State (County) Cave City, KY 42127   (Barren County)
Category(s) Single Trades
Sub-Category(s) Electric, Finishes/Exterior, HVAC, Windows/Doors
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value Less than $200,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

At High/Middle School: The work consists of adding new hollow-metal doors and frames to create a vestibule in the existing lobby providing a secure entrance with access controlled in the reception area. Renovation to the existing administration area including new toilet in nurse’s office and misc. upgrades to finishes. At Elementary School: The work consists of changing out door hardware with electric magnetic hold opens at doors to cafeteria, administration, and corridors to classroom wings to enable locking functions remotely from the reception area. The Work includes, but is not limited to, selective demolition, joint sealants, standard steel doors and frames, aluminum-framed entrances and storefronts, door hardware, glazing, gypsum board assemblies, acoustical panel ceilings, resilient floor tile, paintings, HVAC, electrical (power, communication, and lighting) systems, and complete clean-up and removal of construction debris.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents