Similar Projects
Last Updated | 12/17/2021 02:33 AM |
Project Title | Public Way Concrete 2021/2022 |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT (Salt Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Pre-Bid Meeting on 12/07/2021 at 9:00 AM via Webex. Join link https://saltlakecity.webex.com/saltlakecity/j.php?MTID=maf7f88a052b2e1f4d837fe83461ad5e6, Meeting number (access code): 2497 750 2020, Meeting password: SLCPREBID123, Tap to join from a mobile device (attendees only) +1-408-418-9388,,24977502020## United States Toll Join by phone +1-408-418-9388 United States Toll Global call-in numbers, Attendance Highly Encouraged Estimate: 1. The city engineer’s estimate for this project is over $250,000.00. 2. The city engineer’s estimate for this project is not $2,000,000.00 or more. Schedule No. 1 Roadway Work: 1. 01 71 13 Mobilization Quantity and unit Lump Sum. 2. 02 41 14 Saw Cut Curb Horizontally Quantity and unit 120 Linear Feet. 3. 32 01 91 Tree Root Cut Quantity and unit 6 Each. 4. 32 12 16.13 Asphalt Pavement Tie-in, 6” Thick, PG58-28 DM 1/2", Class III Quantity and unit 1,000 Square Yards. 5. 32 14 13 Detectable Warning Surface, Truncated Dome Pavers Quantity and unit 200 Square Feet. 6. 32 14 13 Detectable Warning Surface, UPGRADE Truncated Dome Pavers Quantity and unit 200 Square Feet. 7. 32 16 13 and 02 41 14 Replace Curb and Gutter, Type A Quantity and unit 1,400 Linear Feet. 8. 32 16 13 and 02 41 14 Replace Flatwork, 4” Thick Quantity and unit 26,000 Square Feet. 9. 32 16 13 and 02 41 14 Replace Flatwork, 6” Thick Quantity and unit 3,000 Square Feet. 10. 32 16 13 Short Load Allowance Quantity and unit 6 Each Unit Price 250.00 Total Cost 1,500.00. 11. 32 16 13 and 02 41 14 Replace Waterway and Waterway Transition Structure Quantity and unit 2,200 Square Feet. 12.32 16 13 Sidewalk Curb Wall, 0” to 12” Tall Quantity and unit 500 Linear Feet. 13.32 16 13 Sidewalk Curb Wall, 12” to 24” Tall Quantity and unit 50 Linear Feet. 14.32 84 23, 32 91 19, 32 92 00, et al. Landscape Restoration Quantity and unit 50 Square Yards. 15.33 05 14 Adjust Manhole Cover Quantity and unit 3 Each. Schedule No. 2 Storm Drain Work: 1. 31 23 16 Install Owner Supplied Pipe Quantity and unit 50 Linear Feet. 2. 32 16 13 and 02 41 14 Replace Curb and Gutter, Type A Quantity and unit 80 Linear Feet. 3. 33 05 14 Adjust Catch Basin Quantity and unit 2 Each. 4. 33 05 14 Adjust Manhole Cover Quantity and unit 2 Each. 5. 33 05 25 T-Patch Asphalt Pavement, 6” Thick, PG58-28 DM-1/2”, Class III Quantity and unit 40 Linear Feet. 6. 33 41 00 Catch Basin / Outlet, Single Grate Quantity and unit 4 Each. Schedule 3 - Roadway Work; Wind Damage Repair: 1. 32 12 16.13 Asphalt Pavement Tie-in, 6” Thick, PG58-28DM 1/2", Class III Quantity and unit 40 Square Yards. 2. 32 14 13 Detectable Warning Surface, Truncated Dome Pavers Quantity and unit 20 Square Feet. 3. 32 16 13 and 02 41 14 Replace Curb and Gutter, Type A Quantity and unit 185 Linear Feet. 4. 32 16 13 and 02 41 14 Replace Flatwork, 4” Thick Quantity and unit 11,500 Square Feet. 5. 32 16 13 and 02 41 14 Replace Flatwork, 6” Thick Quantity and unit 1,000 Square Feet. 6. 32 16 13 Sidewalk Curb Wall, 0” to 12” Tall Quantity and unit 13 Linear Feet. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |