Similar Projects
Tidal Wetland Restoration Demonstration Project
Infrastructure
Bidding
$1,790,000 CJ est. value
Brookhaven, NY 11719

IDIQ Biological, Environmental and Cultural Resources Services
Term Contract
Post-Bid

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Controlled Demolition with Asbestos In Place
Demolition, Alteration
Results
Lindenhurst, NY 11757

Environmental Site Assessment, Soil Sampling and Reporting
Alteration
Post-Bid
Babylon, NY

Replace Heating System
Alteration
Results
$500,000 to $1,000,000 est. value
Babylon, NY 11702

Sewage Treatment Plants Sampling Services
Term Contract
Post-Bid
Yaphank, NY

2022 Invasive Vegetative Control And Removal
Term Contract
Results
Hampton Bays, Southampton, NY 11946

Hazardous Waste Materials Disposal
Alteration
Post-Bid

Controlled Demolition with Asbestos in Place
Demolition, Infrastructure
Results
Wyandanch, NY 11798

Soil Disposal At 29 LNA Sites
Term Contract, Alteration
Post-Bid

Controlled Demolition with Asbestos in Place
Demolition
Results
West Babylon, NY 11704

Water Testing, Sampling and Maintenance at Ocean Beaches
Alteration
Post-Bid
Lindenhurst, NY

HQ Fire Alarm Replacement and Sprinkler System Installation
Alteration
Results
Sound Beach, NY 11789

Last Updated 08/30/2022 10:05 AM
Project Title

Yaphank Correctional Facility Administration Area Demolition

Physical Address View project details and contacts
City, State (County) Yaphank, NY 11980   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the following: Demolition of existing interior walls, finishes, electrical and plumbing. demolition and disposal of interior walls, ceilings, flooring, glazing, steel grating and related conduit and piping A maximum of five percent (5%) of the twelve percent (12%) MBE goal will be allowed for Women Business Enterprise (WBE) subcontractor. 1. complete demolition and disposal of first floor walls, ceilings, slab, door, plumbing fixtures and lighting as per plans. 2.complete removal and disposal of the non-working heating systems (boiler and water heater). 3.electrical wiring, telephone and data not part of the existing security system is to be cut and capped. 4.all plumbing fixtures are to be removed and properly capped off with the intention of reconnection in the future. 5.after all removals are complete, the floor slabs are to be patched to ensure there are no holes, missing sections of concrete, or large gaps that will make the space unsafe. 6.all smoke detection, fire alarm and security systems are to be kept in proper working order.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents