Similar Projects
New Neighborhood School at Monument Ranch
New Construction
Conception
Perris, CA 92570

Pine Ridge Elementary School Class Room Renovation
Renovation, Addition
Conception
$5,400,000 est. value
Magalia, CA 95954

Mission Bay Elementary School
New Construction
Design
San Francisco, CA 94158

Delevan Drive Elementary School
Addition
Design
Los Angeles, CA 90065

Dan O Root Marquee Install
Term Contract
Bidding
$65,000 est. value
Suisun City, CA 94585

Public Works Project(S)
Renovation
Bidding
Stockton, CA 95207

Preconstruction and Lease-Leaseback Construction Services
Renovation
Post-Bid
$2,640,000 est. value
Gustine, CA 95322

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Shade Structure Installation
Renovation
Results
Mill Valley, CA 94941

Architects for Plans to Modify Administrative Building of ABLE Charter Schools
Renovation
Results
Stockton, CA 95207

Cleveland Elementary School New Classroom Building & Interim Housing
New Construction, Demolition - 5,581 SF
Construction
$7,200,000 est. value
San Francisco, CA 94158

Pine Ridge Elementary School New Administration Building
New Construction
Conception
$3,300,000 est. value
Magalia, CA 95954

Mound Fire Reconstruction
Renovation
Bidding
Ventura, CA 93001

Park ES Early Education Center Renovations
Renovation - 3,086 SF
Post-Bid
$220,000 est. value
Alhambra, CA 91899

Shade Structures at 6 Sites
New Construction
Results
Modesto, CA 95357

Reported 03/05/2022 12:00 AM
Project Title

Blanche Sprentz ES Measure G Improvements

Physical Address View project details and contacts
City, State (County) Folsom, CA 95630   (Sacramento County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 - must be Substantially Complete by August 5, 2022. Phase 1 shall consist of the following components of the Project: Existing Bldg. B Improvements and adjacent concrete flatwork - This includes the demolition of and replacement of the existing restrooms and a new fire hydrant to replace an existing one near Bldg. B Improvements to the parking / bus loading lot - Work includes the asphaltic concrete improvements to this parking lot and ADA parking stall. Also adjacent concrete flatwork. Upper Hardcourt Improvements - This includes new vehicular and ADA compliant routes to what will be a combination parking / hardcourt play area. To make the cut for the new vehicular access a SMUD primary line will be relocated; site lighting, fencing, and AC paving work is also involved. Building demolition and adjacent site demolition of the Existing Multi-Purpose Bldg. F. Phase 2 Must be Substantially Complete by January 16, 2023. Phase 2 - shall consist of all work necessary to complete the construction of the New Multi Purpose Bldg. F.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents