Similar Projects
Belleville East Creek Sewer Separation Project
Infrastructure
Design
$10,000,000 CJ est. value
Belleville, IL 62220

Belleville East Creek Sewer Separation Project
Infrastructure
Design
$10,000,000 CJ est. value
Belleville, IL 62220

County Wide Striping - Re-Striping Existing Roadways
Infrastructure
Bidding
$500,000 CJ est. value
Belleville, IL 62220

County Wide Striping - Re-Striping Existing Roadways
Infrastructure
Bidding
$500,000 CJ est. value
Belleville, IL 62220

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Winstanley Park (Sinai Village Phase III)
New Construction, Renovation, Infrastructure - 44,122 SF
Post-Bid
$9,000,000 CJ est. value
East Saint Louis, IL 62201

4th Street Reconstruction
Infrastructure
Results
$1,663,811 est. value
Belleville, IL

Repair Asphalt Roads and Parking Scott AFB
Alteration
Results
$500,000 to $1,000,000 est. value
Scott Air Force Base, IL

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

West Presidential Streets Phase 2 - City Of O'Fallon
Infrastructure
Pending Verification
$1,500,000 CJ est. value
O Fallon, IL 62269

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Hot-Mix Asphalt Pavement
Infrastructure
Post-Bid
Belleville, IL

Pavement Widening, HMA and PCC Pavement, Storm Sewer, Curb and Gutter, Replace the Deck on the Structure over the Tributary to Richland Creek, Pipe Culverts, Guardrail, Pavement Markings, and Traffic Signal Improvements on Frank Scott Parkway from West of Old Collinsville Road to West of Green Mount Road
Infrastructure
Results
IL

Last Updated 07/13/2023 12:09 PM
Project Title

Aggregate, Bit. Mat. (Seal Coat)

Physical Address View project details and contacts
City, State (County) Freeburg, IL 62243   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $12,325 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 13, 2023 the project is awarded to Beelman logistics, awarded amount is $12,325 City/County : Freeburg Section No : 24-00000-00-GM All Items Furnished to Village Stockpile 1a. Aggregate Ca6 - 300 Ton 1b. Aggregate Ca11 - 50 Ton 1c. Aggregate Rr3 - 50 Ton 2. Seal Coat Aggregate - 500 Ton 3. Bituminous Materials Seal Coat - 63 Ton ILDOT - Aggregate, Bit. Mat. (Seal Coat)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents