Similar Projects
PAFB Bldg 845 Premise Wiring
Post-Bid
Colorado Springs, CO 80914

Switches and Ups for The Pikes Peak Library District
Post-Bid
Colorado Springs, CO 80900

Smartsensor Installation
Results
Less than $300,000 est. value
CO

Aclara Electric Meters
Term Contract
Results
Colorado Springs, CO 80947

Automatic Throw Over Switch (ATO) Project
Post-Bid
Colorado Springs, CO 80947

Generators and Emergency Response Equipment
Results
Fountain, CO 80817

On-Call and Emergency Electrical Services
Term Contract
Post-Bid
Colorado Springs, CO 80903

Transformer Alliance: Single and Three Phase Padmount, Overhead and Submersible
Term Contract
Results
Colorado Springs, CO 80947

Installation of New Premise Wiring and Removal of Existing Outdated Premise Wiring in Building 845 on Peterson AFB, CO
Post-Bid
Colorado Springs, CO

UPS Battery Replacement and Installation
Results
Fort Carson, CO 80913

Turbine and Generator Blanket Work and Front Range Power Plant Steam Turbine and Generator Inspections
Post-Bid
Fountain, CO 80947

Nixon ZD Switchgear
Results
Fountain, CO 80817

On-Call Emergency Generator Maintenance and Services
Post-Bid
Colorado Springs, CO 80910

Transformer (750KVA) Pad Mount Replacement and Installation
Results
Colorado Springs, CO 80914

Main Electrical System and Emergency Generator Replacement, CC, Phase 1
Post-Bid
$650,000 to $850,000 est. value
Colorado Springs, CO 80906

Last Updated 12/02/2020 04:29 AM
Project Title

Integrated Resource Plan (Irp) Drake 115Kv Transmission Line Design/Build (D/B)

Physical Address View project details and contacts
City, State (County) CO   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This new 115kV transmission line is an important project to Utilities, and part of a group of projects in the electric sub-portfolio under the larger Integrated Resource Plan (IRP) Implementation Portfolio that will enable Utilities to retire the Drake Power Plant (Drake). This project (as a part of the electric sub-portfolio) will be managed within Utilities’ System Planning and Projects (SPP) Division, and by a Project Manager (PM) from the Energy Projects and Program Management (EPPM) Group and an engineer from the Substation and Transmission Engineering (STE) Group serving as Project Technical Lead.

Details

Division 26 - Electrical, Low-Voltage Electrical Transmission.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents