Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Chain Link Fence
Infrastructure
Design
$400,000 CJ est. value
Socorro, TX 79927

RFQ D/B - El Paso Public Safety Training Academy and Fire Department Headquarters
Renovation, Infrastructure
Design
$33,000 CJ est. value
El Paso, TX 79905

RFQ Construction Manager-at-risk - Advanced Teaching and Learning Complex
Addition, Renovation, Infrastructure
Bidding
$52,400,000 CJ est. value
El Paso, TX 79968

North 1 Reservoir Roof Rehabilitation and Cielo Vista 0.1 MG Ground Storage Tank Replacement and Elevated Tank Ladder and Safety Improvements
Demolition, New Construction, Infrastructure
Bidding
$2,488,767 CJ est. value
El Paso, TX 79925

Crown Point II And Nevins Packed Tower Air Strippers
Infrastructure
Sub-Bidding
$2,263,816 CJ est. value
El Paso, TX 79925

IH0010 - Districtwide Crack Seal
Infrastructure
Sub-Bidding
$510,275 CJ est. value
El Paso, TX 79927

Job Order Contracting and Facilities Construction
Term Contract
Post-Bid
El Paso, TX 79901

Job Order Contracting and Facilities Construction
Term Contract
Post-Bid
El Paso, TX 79901

Modesto Gomez Park Improvements
Infrastructure
Results
$2,977,800 CJ est. value
El Paso, TX 79905

Central Business District Phase IV
Results
$13,500,000 to $14,500,000 est. value
El Paso, TX 79821

Phase 1, Shell Building 'C' / Mountain Pass Business Park
New Construction, Infrastructure - 16,100 SF
Pending Verification
$1,460,000 CJ est. value
El Paso, TX 79925

Ola Logistics Tenant Improvement
Addition, Demolition, Renovation, Infrastructure - 2,200 SF
Pending Verification
$250,000 CJ est. value
El Paso, TX 79912

Taxiway U from Customs Ramp to Taxiway V (Mill and Overlay) - City of El Paso
Infrastructure
Conception
$2,500,000 CJ est. value
El Paso, TX 79925

Last Updated 08/10/2022 01:34 PM
Project Title

Mesa St. and Texas Ave. Stormwater Main Replacement

Physical Address View project details and contacts
City, State (County) El Paso, TX 79901   (El Paso County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall include, but is not limited to, the installation of approximately 260 linear feet of 18-inch reinforced concrete pipe stormwater main, installation of approximately 50 linear feet of 12-inch reinforced concrete pipe; remove 2 existing inlets and installation of 1 inlet Type I with 2-grates and 1 inlet Type II with 5 grates; remove of 2 existing junction boxes, remove of 2 existing manholes, installation of 2 cast-in-place 4'x4' junction boxes; installation of 1 cast-in-place 3'x10' junction box and removal of approximately 55 linear feet of 12-inch reinforced concrete pipe. Removal, disposal and replacement of approximately 795 square yards of reinforced concrete pavement, 45 linear feet of concrete curb/gutter/rolled curb, concrete hardscape; and miscellaneous striping and markings. These improvements will require trench safety system for pipeline; videotaping of project site before and after construction; and a Storm Water Pollution Prevention Plan. Works to Be Provided for This Project Shall Be for Furnishing All Labor, Materials, Transportation, and Services for the Construction and Installation as Follows: the Project Consists of the Replacement of Existing Reinforced Concrete Pipe Stormwater Main That Has Failed Along Mesa St. Between Mills St. And Texas Ave. The Work Under This Contract Shall Be for Furnishing All Labor, Materials, Transportation and Services for the Construction and Installation of the Following Work: Installation of Approximately 260 Linear Feet of 18-inch Reinforced Concrete Pipe Stormwater Main, Installation of Approximately 50 Linear Feet of 12-inch Reinforced Concrete Pipe; Remove 2 Existing Inlets and Installation of I Inlet Type I With 2-grates and I Inlet Type Ii With 5 Grates; Remove of 2 Existing Junction Boxes, Remove of 2 Existing Manholes, Installation of 2 Cast-in-place 4' X4' Junction Boxes; Installation of I Cast-in-place 3' X 1 O' Junction Box and Removal of Approximately 55 Linear Feet of 12-inch Reinforced Concrete Pipe. Removal, Disposal and Replacement of Approximately 795 Square Yards of Reinforced Concrete Pavement, 45 Linear Feet of Concrete Curb/gutter/rolled Curb, Concrete Hardscape; and Miscellaneous Striping and Markings. These Improvements Will Require Trench Safety System for Pipeline; Videotaping of Project Site Before and After Construction; and a Storm Water Pollution Prevention Plan. Txdot Will Provide Traffic Control. The Construction Time for This Project From Notice to Proceed to Final Completion Will Be 120 Calendar Days. Key Personnel Required for This Project Are the Bidder's Project Manager, Project Superintendent and Foreman. For Additional Information, Submit Your Inquiry to the Purchasing / Contracts Email Address: Purchasing.info@epwater.org.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents