Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Main Street Milpitas
New Construction, Infrastructure - 350,257 SF
Design
$16,300,000 CJ est. value
Milpitas, CA 95035

Place Polyester Concrete Overlay and HMA (Type A)
Infrastructure
Bidding
$1,600,000 CJ est. value
Santa Clara, CA 95054

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Construction at Huff Gardens Apartments - Exterior Envelope and Site Improvements
Infrastructure
Post-Bid
$525,000 CJ est. value
San Jose, CA 95128

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Digester No 4 Coating and Annular Seal Repair
Renovation
Results
Sunnyvale, CA 94089

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Route 87/Taylor Bike/Ped Improvements - City of San Jose
Infrastructure
Conception
$532,000 est. value
San Jose, CA 95110

Monterey Road Guardrail Project
Infrastructure
Design
$1,835,020 CJ est. value
San Jose, CA 95138

Last Updated 10/06/2022 06:33 PM
Project Title

SCWP Filter Control Building - 833330 - City of Sunnyvale

Physical Address View project details and contacts
City, State (County) Sunnyvale, CA 94087   (Santa Clara County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected February 2027
Bids Due View project details and contacts
Estimated Value $5,800,668 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Filtration is part of tertiary treatment, which makes wastewater that has undergone primary and secondary treatment clean for discharge. The new Filter Control Building will be updated with electrical equipment, instrumentation, and controls that will be constructed for the tertiary treatment facilities. This project entails replacing the existing facility with a new Filter Control Building. The major project elements include demolition of the existing Filter Control/Lab Building and equipment, installation of temporary supervisory control and data acquisition controls (SCADA), a new filter control building, new electrical equipment (including motor control centers), new instrumentation and controls, and the extension/connection into the upgraded Water Pollution Control Plant (WPCP) SCADA system. Filter Control Building (Includes Demolition of Existing) is Project 3.1 in the Sunnyvale Cleanwater Program Master Plan adopted by City Council in 2016. The engineering design phase of the project starts in FY 2023/24 and ends in FY 2024/25, while the construction phase of the project starts in FY 2025/26 and ends in FY 2026/27. This project is currently in the City of Sunnyvale's FY 2022 - 2023 CIP. Per the owner, as of October 6, 2022, no designer or general contractor has been procured for the project. The owner states that construction is anticipated to begin in 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents