Similar Projects
6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Finkbine Street and Parking Lot 5 Paving Replacement
Infrastructure
Bidding
$200,000 est. value
Des Moines, IA 50319

Greenbelt Trail Expansion Phase 2
Infrastructure
Bidding
$470,000 est. value
Stanton, IA

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Lindale Trail Phase II from I-380 to Council Street North East
Conception
$1,200,000 est. value
Cedar Rapids, IA

Construction of Sidewalks, a Parking Lot, Driveway, Retaining Walls, Storm Drainage System, and Grading
Infrastructure
Bidding
$800,000 est. value
Corning, IA 50841

Pottawattamie County Election's Building Parking Lot
Infrastructure
Post-Bid
Council Bluffs, IA

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Wiley Boulevard Trail from Williams Boulevard to 16th Street SW
Conception
$1,293,385 est. value
Cedar Rapids, IA 52407

Rock Creek Greenway Trail Improvements
Infrastructure
Bidding
$125,300 est. value
Ankeny, IA 50023

Last Updated 05/24/2022 12:07 AM
Project Title

High Trestle Trail South Avenue to Hwy 210 Recreational Trail

Physical Address View project details and contacts
City, State (County) Woodward, IA 50276   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The overall project shall be defined as all utility, grading, backfill, topsoil, finish grading, pavement markings and trail work completed with the streets, driveways, and sidewalks/trails fully open to traffic. The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The proposed project includes 765 CY class 10 excavation, 3,290 special subgrade preparation for shared use path, 125 LF of storm sewer pipe (12 inch to 15 inch), 4 SW-512 intakes, 143 SY of 6" PCC Driveway, 3,013 SY of 6" PCC shared use path, 97 SY of sidewalk removal, 781 LF of 72" Wood Privacy Field Fence, trail signage, traffic control, erosion control, surface restoration, and other miscellaneous work.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents