Similar Projects
Combined Use Pathway - Ligi Way and Farmingville Road
Infrastructure
Bidding
$200,000 est. value
Ridgefield, CT

Pavement Preservation and Repairs, Spring 2022
Infrastructure
Bidding
$500,000 est. value
Westport, CT

Sidewalk Repair and Rehabilitation Program
Post-Bid
Darien, CT

Webster Street Lot Redevelopment
Infrastructure
Post-Bid
Norwalk, CT

Balmforth Avenue Sidewalks, Intersection and Related Improvements
Results
Danbury, CT

Removal and Replacement of Siding, Windows, Entry Doors and Repaving of Parking Lot at Ludlow Village Apartments
Results
Norwalk, CT 06855

Eden Drive Parking Lot Repaving
Infrastructure
Bidding
$300,000 est. value
Danbury, CT 06811

Avery Place Utility Burial Project
Infrastructure
Post-Bid
Westport, CT

Whitney Avenue Sidewalk Improvements
Results
Trumbull, CT 06611

The Baldwin Parking Lot Redesign & Reconstruction Project
Infrastructure
Post-Bid
Westport, CT

Construction Services for Pequonnock River Trail Extension
Results
Bridgeport, CT

Wilton Station Pedestrian Walkway Bridge
New Construction, Infrastructure
Post-Bid
Wilton, CT

Norwalk River Valley Trail - Wil-Walk Construction
Results
Wilton, CT

Downtown Intermodal Urban Design Enhancement
Results
Bridgeport, CT 06604

Downtown Danbury Transit-Oriented Development ("TOD") Streetscape Renaissance Project - Phase 1
Results
$1,250,000 est. value
Danbury, CT

Last Updated 05/19/2022 12:18 AM
Project Title

Sidewalks and Curbing, Highland Avenue Safe Routes to School, Brookside Elementary School and Brien McMahon High School

Physical Address View project details and contacts
City, State (County) Norwalk, CT   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sidewalks and Curbing, Highland Avenue Safe Routes to School, Brookside Elementary School and Brien McMahon High School

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents