Similar Projects
21 Maintenance Facility - 32-P60 - City of Plano
New Construction
Conception
$12,000,000 est. value
Plano, TX

Spring Creek Interceptor Phase 3 - 34-P06 - City of Plano
Infrastructure
Conception
$7,500,000 CJ est. value
Plano, TX 75074

Guest House on Garrett / 521 Bryan
New Construction, Infrastructure - 39,870 SF
Design
$3,283,000 CJ est. value
Dallas, TX 75201

Everest Stone Showroom and Warehouse
New Construction, Infrastructure - 7,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75229

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Post-Bid
$460,000 CJ est. value
Dallas, TX 75252

Waterline Improvements Project - McKinney Street and Baker Street
Infrastructure
Results
Farmersville, TX 75442

RFQ Construction Manager- Construction Management DNT Widening From SRT to US 380
Infrastructure
Results
$7,631,787 CJ est. value
Plano, TX 75074

The Avenue
New Construction, Infrastructure
Construction
$500,000,000 CJ est. value
Allen, TX 75013

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Construction
$95,000,000 CJ est. value
McKinney, TX 75069

Starbucks - Renner & PGBT
New Construction, Infrastructure - 2,063 SF
Pending Verification
$735,140 CJ est. value
Plano, TX 75074

Lone Star Medical Center - Building Two
New Construction, Infrastructure - 15,430 SF
Pending Verification
$2,000,000 CJ est. value
Allen, TX 75013

Spring Creek Interceptor Phase 2 - 34-P05 - City of Plano
Infrastructure
Conception
$9,000,000 CJ est. value
Plano, TX 75074

Bonton Farms Wellness Center
New Construction, Infrastructure - 4,700 SF
Design
$5,500,000 CJ est. value
Dallas, TX 75215

Fuel City Travel Center / Wylie
New Construction, Infrastructure - 9,244 SF
Post-Bid
$4,400,000 CJ est. value
Wylie, TX 75098

Last Updated 10/11/2023 04:11 PM
Project Title

Frank Beverly Park Drainage Improvements

Physical Address View project details and contacts
City, State (County) Plano, TX 75025   (Collin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $153,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Frank Beverly Drainage Improvements, Project No. 7372 Renovation to Frank Beverly Park which will alleviate standing water and facilitate faster drainage in the far northwest corner of the park. The location of this project is 7112 Quarry Chase Trail in the City of Plano, Texas. A location map is included in the plans. BID OPENING LOCATION Bids will be publicly opened and read at the Municipal Center. Tabulations for these solicitations should be available on Ionwave within 48 hours of the opening. In some cases, they may be available earlier. We ask that you limit exposure by viewing tabulations electronically through IonWave, rather than attending at City Hall PRE-BID MEETING: To attend the non-mandatory pre-bid meeting, access the TEAMS Teleconference via the information below: TEAMS MEETING NUMBER 469-998-7570 & CONF. ID 704 725 136# SITE VISIT : For the mandatory self-guided site visit, view the project work area at the following location: Frank Beverly Park 7112 Quarry Chase Trail Plano, Texas 75074 IMPORTANT: A mandatory self-guided site visit must be done PRIOR to the Bid Close Date/Time. The Certificate of Completed Mandatory Self-Guided Site Visit form, see Solicitation Submittals (Section 3), should be completed and included in your sealed bid QUESTIONS : Submit all questions on the solicitation's question portal on PlanoTX.ionwave.net by the Question Deadline. Answers will be provided via the IonWave interface or addenda on PlanoTX.ionwave.net. The City of Plano is soliciting the renovation to Frank Beverly Park which will alleviate standing water and facilitate faster drainage in the far northwest corner of the park, trail replacement, irrigation repair, and sod establishment. Question Cutt off Date & Time 9/28/2023 03:00:00 PM (ET) This project is estimated at $153,000.00. Include a bid bond or a bid guarantee in the form of a cashier's check or certified check in an amount not less than five percent (5%) of the total maximum bid price. This is a guarantee that the bidder will enter into a contract and execute the performance bond and the payment bond on the forms provided in this solicitation. Checks shall be issued by a national or state bank and the bid bond shall be from a reliable surety company. A BID BOND or a CASHIERS CHECK in the amount of 5% of the amount bid must be received by The City of Plano Purchasing Division prior to the published bid closing date/time

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents