Similar Projects
O.B. Curtis Water Treatment Plant Membrane Filter System Train 5 Replacement
Renovation
Results
Jackson, MS

Starlanding Water System Improvements Phase II - Water Treatment Plant
New Construction
Results
$2,683,300 est. value
MS

Water System Improvemnts
New Construction
Bidding
Bassfield, MS

Nanofiltration Water Treatment Plant located in Gautier, Mississippi
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Gautier, MS

NTS Water Association
Renovation
Post-Bid
Meridian, MS 39304

Engineering Services
Term Contract
Post-Bid
Philadelphia, MS

North Pleasant Hill Water Plant Rehabilitation
Renovation
Results
$1,200,000 est. value
Olive Branch, MS

Repair Wastewater Treatment Systems
Renovation
Post-Bid
$250,000 to $500,000 est. value
Flowood, MS 39232

Facility Improvements Contract A - Weir Improvements
Renovation
Post-Bid
$1,300,000 est. value
Fulton, MS 38843

City of Grenada Water Treatment Facility Contract "B" Fort Hill Treatment Plant
Renovation
Post-Bid
Grenada, MS

JH Fewell Water Treatment Plant Corrosion Control Chemical Feed System Improvement Project
Renovation
Bidding
Jackson, MS 39202

Water Treatment Facility (Contract A)
Post-Bid
Grenada, MS

Water Plant 1 Rehabilitation Phase 1
Post-Bid
$976,911 est. value
Hattiesburg, MS

Phase III Water Treatment Plant and System Upgrades
New Construction
Post-Bid
Iuka, MS

Reported 03/02/2022 12:00 AM
Project Title

Friendship Community Water Association - Water System Improvements

Physical Address View project details and contacts
City, State (County) McComb, MS   (Pike County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, 8” solenoid valve installation, water well modifications, water treatment plant, 6” and 8” raw water main installation, and electrical/control improvements.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 22 - Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents