Similar Projects
5100 Reidsville Road
New Construction - 5,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Walkertown, NC 27051

Living Word Fellowship Townhomes
New Construction
Conception
Winston-Salem, NC 27106

Old Mill Subdivision
New Construction
Design
Clemmons, NC 27012

Metropolitan Village
New Construction - 39,810 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27101

Grading, Drainage, Paving, and Structures
Infrastructure
Bidding
$2,000,000 CJ est. value
Kernersville, NC 27284

Grading, Drainage, Paving, and Structures
Infrastructure
Bidding
$2,000,000 CJ est. value
Kernersville, NC 27284

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Town of Lewisville, Williams Rd Gateway Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Lewisville, NC 27023

Fiddlers Creek Outfall Replacement
Infrastructure
Results
$14,551,412 CJ est. value
Winston Salem, NC 27101

Grading, Paving, Drainage, and Structure
Results
NC

Ardmore Commons
New Construction
Construction
Winston-Salem, NC 27103

CarMax #7278
Renovation - 10,247 SF
Construction
$707,645 est. value
Winston-Salem, NC 27103

Rosewood Place
New Construction, Infrastructure
Pending Verification
$9,800,000 CJ est. value
Winston Salem, NC 27103

Rosewood Place
New Construction, Infrastructure
Pending Verification
$9,800,000 CJ est. value
Winston Salem, NC 27103

450 Polo Road
New Construction
Conception
Winston-Salem, NC 27105

Last Updated 09/06/2022 12:04 PM
Project Title

Polo Road Townhouses

Physical Address View project details and contacts
City, State (County) Winston Salem, NC 27105   (Forsyth County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Gas Station, Multi-Family Homes, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $16,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of six, two and three story townhouse buildings and a clubhouse with a swimming pool on 3.92 acres. As of September 6, 2022 the project is in planning stage and seeking environmental approval. The city/county Planning Board approved a rezoning request May 13, 2021. Information regarding the architect, general contractor and method of selection has not been disclosed. A construction timeline has not been determined, but is not expected to begin before the spring of 2023.

Details

3 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Panel Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents