Similar Projects
Walnut Street Replacement 3rd-7th - City of Rawlins
Alteration
Conception
$1,800,000 est. value
Rawlins, WY 82301

Lucky Star Wind Farm
New Construction, Infrastructure
Conception
$650,000,000 CJ est. value
Medicine Bow, WY 82329

Two Rivers North Wind Farm
New Construction, Infrastructure
Design
$540,000,000 CJ est. value
Medicine Bow, WY 82329

Carbon County County Road 702 Over Muddy Creek Structure No. Dmw
Demolition, New Construction, Infrastructure
Design
$824,000 CJ est. value
Dixon, WY 82323

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

Grading, Milling Plant Mix, Bituminous Pavement Surfacing (recycle), Chip Seal (overshoot), Bridge Rehabilitation and Miscellaneous Work
New Construction, Infrastructure
Results
WY

Grading, Milling Plant Mix, Bituminous Pavement Surfacing (recycle), Chip Seal (overshoot), Bridge Rehabilitation and Miscellaneous Work
New Construction, Infrastructure
Results
WY

TransWest Express Transmission Project
New Construction, Infrastructure
Pending Verification
$3,000,000,000 CJ est. value
Rawlins, WY 82301

Saratoga Highlands Condominium
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Saratoga, WY 82331

Rawlings to Laamie Wagonhound West I-80 Eastbound Lane - I804272 - Carbon County
Infrastructure
Conception
$6,457,000 CJ est. value
Rawlins, WY 82301

Laramie to Rawlins Dana Ridge Section Westbound Lane/i-80 Structure No. Aux
Infrastructure
Design
$9,743,000 CJ est. value
Sinclair, WY 82334

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Bituminous Pavement Surfacing (Recycle), Plant Mix Wearing Course, Bridge Rehabilitation, Guardrail And Miscellaneous Work
New Construction, Infrastructure
Results
WY

Laramie To Rawlins Dana Ridge Section Westbound Lane / I- 80 - I804275 - Carbon County
Infrastructure
Conception
$7,316,000 CJ est. value
Rawlins, WY 82301

Last Updated 05/03/2023 03:33 AM
Project Title

Carbon County County Road 3 Over Third Sand Creek Structure No. Dmr

Physical Address View project details and contacts
City, State (County) Elk Mountain, WY 82324   (Carbon County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2025 , Construction documents
Bids Due View project details and contacts
Estimated Value $792,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Character of Work : Bridge Replacement As of May 03, 2023, the project is in Conceptual status. Anticipated Construction year is 2025. WYDOT - Carbon County County Road 3 Over Third Sand Creek Structure No. Dmr *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents