Similar Projects
Sand Spring Run Stream Bank Restoration
Design
Stroudsburg, PA

Dunbar Creek Flood Protection Project
Post-Bid
$500,000 to $1,000,000 est. value
Dunbar, PA 15431

Pipe
Post-Bid
Rome, Wysox, PA 18837

Doyle Avenue Landslide Repair
Results
PA

Butternut Lane Culvert Project
Results
Millville, PA 17846

Lake Association Pavilion - Drainage and Landscaping Construction
Post-Bid
Mountain Top, PA 18707

SR 866 Culvert Rehabilitation Project
Results
Williamsburg, PA

Reed Road Culvert Replacement Project
Post-Bid
New Castle, PA 16101

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Frame, Park Grate
Post-Bid
Philadelphia, PA 19107

Reconstruction of Mckinley Street Wall
Results
Export, PA

Green Forest Drive Culvert Replacement Project
Results
Baden, PA

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Wakefield Road Drainage Improvements
Results
Less than $147,623 est. value
PA

Hamilton Terrace Drainage and Pavement Improvements Project
Results
Lewistown, PA

Last Updated 12/19/2019 12:48 PM
Project Title

Poplar Run Streambank Stabilization - Freedom Township Water and Sewer Authority

Physical Address View project details and contacts
City, State (County) East Freedom, PA 16637   (Blair County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Include the placement of R-5 rock riprap to armor the bank and infill behind with suitable material along the southerly bank of Poplar Run beginning approximately 55 feet downstream of the southern abutment of the Dunnings Highway Bridge and immediately abutting the newly installed "J-Hook Rock Vane" quarry rocks installed under the recent PADOT bridge replacement project. Re-establishment of the streambank will extend downstream along the southerly bank for a total distance of approximately 100 feet. The Authority will purchase the following materials: 500 Tons of R-5 rock, 1 roll of 15x300 class 2 geotextile fabric, 100 Ton of 2A stone for site/road restoration.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents