Similar Projects
Major HVAC Renovation at Franklin S Edmonds School - General
Alteration
Bidding
$482,395 est. value
Philadelphia, PA 19150

Philadelphia Pa Cetc Hvac Upgrades
Alteration
Bidding
Philadelphia, PA 19104

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Bally Walk-In Freezer
Post-Bid
Philadelphia, PA

Air Conditioner 10,000 Btu 120 V R410a
Results
Less than $25,000 est. value
Philadelphia, PA

General HVAC Services (Maintenance and Repair)
Results
Philadelphia, PA 19102

Compressor (New) Cummins 5286681 Air
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Fume Hood Filters
Results
Philadelphia, PA

Duct Work
Post-Bid
Philadelphia, PA

Multi Zone 36K Heat Pump Condenser
Results
Philadelphia, PA

Overload Westcode Wd35140-003 SLV HVAC
Post-Bid
Philadelphia, PA

36K Heat Pump / AC Evaporator
Results
Philadelphia, PA

Radiator Covers
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

HVAC Replacement at Yeadon Public Library
Results
Yeadon, PA 19050

Overload SLV HVAC Compressor ABB
Post-Bid
Philadelphia, PA

Last Updated 07/01/2021 08:41 AM
Project Title

Z--INDE 236306-Replace Chiller Plants/Cooling Towers

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19106 (Delaware, Philadelphia Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following components: (1) INDE 236306 - Replace Critical Components - Chillers Number One & Two: This project will remove and replace two centrifugal chillers and their associated controls, pumps, valves, and actuators. Chillers #1 and #2 are 500-ton units installed when the park's central chiller plant was constructed in 1999 and are beyond their useful life. (2) INDE 310912 - Replace Failing Chiller #3 and Cooling Tower #3 at Central Chilled Water Plant: This project will replace one 2005 vintage 500-ton water cooled centrifugal chiller, and one 2005 vintage 500-ton forced draft cooling tower. (3) INDE 310913 - Replace Two Failing Cooling Towers at Central Chilled Water Plant: This project will replace two 1999 vintage 500-ton forced draft cooling towers with two new 750-ton induced draft cooling towers at the Central Chilled Water Plant. It remains essential that the park's central chiller plant remains in continuous operation. Chilled water from the plant must be available year-round to control temperatures and humidity in the park's most critical buildings.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Cooling Towers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents