Similar Projects
Trailside at Everett Park Phase II
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
South Haven, MI 49090

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

MoTown Square Affordable Assisted Living
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Grand Rapids, MI 49507

Chippewa Correctional Facility (URF) - Steam and Steam Condensate Tunnel
Renovation
Bidding
$300,000 CJ est. value
Kinross Charter Township, MI 49788

Bay Mills Justice Center Expansion
Addition, Demolition, Infrastructure
Bidding
$7,000,000 CJ est. value
Brimley, MI 49715

Parkland Plaza Senior Living Facility - Rebid
New Construction, Infrastructure - 163,690 SF
Post-Bid
$50,000,000 CJ est. value
Ann Arbor, MI 48103

The Grove at Veridian
New Construction, Infrastructure - 10,076 SF
Post-Bid
$10,000,000 CJ est. value
Ann Arbor, MI 48104

Straits State Park Toilet Shower Building
New Construction, Infrastructure
Results
$2,045,247 CJ est. value
Saint Ignace, MI 49781

Cemetery and Volunteer Park Grading Project
Results
$115,000 est. value
South Lyon, MI

Mill Creek Townhomes
New Construction, Infrastructure, Renovation - 7,010 SF
Construction
$21,000,000 CJ est. value
Ann Arbor, MI 48108

The Perennial Corktown
New Construction, Infrastructure - 2,236 SF
Construction
$78,200,000 CJ est. value
Detroit, MI 48216

ProMedica Monroe Regional Hospital / Frenchtown Charter Township
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Monroe, MI 48162

University of Michigan Center for Innovation
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48204

English Hills Apartments
New Construction, Infrastructure - 234,432 SF
Design
$45,000,000 CJ est. value
Grand Rapids, MI 49544

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Last Updated 05/31/2023 04:31 AM
Project Title

Deerfield Correctional Facilities Building Demolitions Project - Ionia Michigan

Physical Address View project details and contacts
City, State (County) Ionia, MI 48846   (Ionia County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,325,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Deerfield Correctional Facilities Building Demolitions Project - Ionia Michigan All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith at email address: SmithD76@michigan.gov. The email Subject must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). Demolition of multiple structures at both the Deerfield and Riverside facilities. The Deerfield facility consists of 14 identified buildings, seven (7) structures which do not qualify as buildings, security fencing with razor wire, significant paving, light poles, and underground utilities. The demolition scope includes the demolition and disposal of all buildings, structures, pavement, fencing, underground utilities (excepting municipal utilities), and all below grade structures within the limits of demolition. The work includes appropriate cutting, capping, and appropriate abandonment of utilities. All debris, subsurface structures, subsurface structural elements, and subsurface utilities shall be removed. The site shall be returned to the established grade and restored per the project specification. If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk. Bid Responses should not be emailed to the Project Director. Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Alexi Koltowicz at akoltowicz@trimediaee.com no later than 2:00 p.m., Eastern on April 18, 2023. Demolition of multiple structures at both the Deerfield and Riverside facilities. The Deerfield facility consists of 14 identified buildings, seven (7) structures which do not qualify as buildings, security fencing with razor wire, significant paving, light poles, and underground utilities. The demolition scope includes the demolition and disposal of all buildings, structures, pavement, fencing, underground utilities (excepting municipal utilities), and all below grade structures within the limits of demolition. The work includes appropriate cutting, capping, and appropriate abandonment of utilities. All debris, subsurface structures, subsurface structural elements, and subsurface utilities shall be removed. The site shall be returned to the established grade and restored per the project specification. Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents