Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

2021 Storm Sewer and Water Main Extension Project
Infrastructure
Bidding
Clear Lake, IA

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Bidding
Johnston, IA

Street Repair Retainer
Term Contract, Infrastructure
Post-Bid
West Des Moines, IA

Booneville Road - South 100th Street to South 115th Street
Infrastructure
Post-Bid
West Des Moines, IA

West Elm and North Vine Street Improvements
Results
$553,988 est. value
West Union, IA

Clover Lane Overlay
Results
Asbury, IA

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Grand Avenue - South Grand Prairie Parkway to South 115th Street
Infrastructure
Bidding
West Des Moines, IA 50266

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

Ludland Drive Street Repair
Results
$64,079 est. value
Manchester, IA

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Last Updated 09/13/2021 08:49 AM
Project Title

Camanche 2021 Street Improvements Phase 3

Physical Address View project details and contacts
City, State (County) Camanche, IA 52730   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HMA mill & overlay of various streets, along with complete roadway reconstruction of Middle Road from 9th Avenue to 19th Avenue with PCC Pavement, associated storm sewer installation, driveway, and sidewalk replacement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents