Similar Projects
True Storage / New Windsor
New Construction
Conception
$3,000,000 est. value
New Windsor, NY 12553

Stowaway Self Storage Expansion
Addition, Infrastructure - 89,000 SF
Conception
$9,600,000 CJ est. value
Rock Tavern, NY 12575

RDM Warehouses
New Construction - 345,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Montgomery, NY 12549

Superio Warehouse Addition
Addition - 25,000 SF
Design
Chester, NY

New Fire Station - General Construction (GC)
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
New Hampton, NY 10958

134 Neeleytown Road Warehouse
New Construction - 317,500 SF
Post-Bid
$10,000,000 CJ est. value
Montgomery, NY 12549

Humane Society of Port Jervis Pole Barn / Kennel
New Construction, Infrastructure
Post-Bid
$100,000 CJ est. value
Port Jervis, NY 12771

Snow Removal Equipment Storage Building at Orange County Airport
New Construction
Results
Montgomery, NY 12549

New Storage Building (Phase I) New Fire Station (Phase II)
New Construction, Infrastructure
Results
$15,776,000 CJ est. value
New Windsor, NY 12553

President Container Storage
Addition - 98,500 SF
Construction
$7,309,746 est. value
Middletown, NY 10941

Automotive Audio Retail Building
New Construction - 12,000 SF
Construction
Montgomery, NY 12586

Guardian Self Storage
Addition - 16,100 SF
Pending Verification
New Windsor, NY

Royal Pools Warehouse and Service Building
New Construction, Infrastructure - 12,000 SF
Pending Verification
$1,200,000 CJ est. value
Middletown, NY 10941

Pole Barn
New Construction, Infrastructure - 2,400 SF
Post-Bid
$107,864 CJ est. value
Mt Hope, NY 10963

Roof Replacements and Storage Buildings Construction
New Construction, Alteration
Results
$842,542 to $1,139,910 est. value
Bear Mountain, New Windsor, Stony Point, Valley Cottage, Woodbury, NY 12553

Last Updated 01/06/2023 12:38 PM
Project Title

Vails Gate Fire District New Firehouse - New Windsor

Physical Address View project details and contacts
City, State (County) New Windsor, NY 12553   (Orange County)
Category(s) Commercial, Government/Public
Sub-Category(s) Fire/Police Station, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $16,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to replace the existing two-story firehouse with a new two-story approximately 21,970sqft firehouse and a new storage/maintenance building approximately 3,600 square foot. As of January 6 2023, this project is in the permitting stage as per source. A general contractor has been selected. Construction can be expected to start sometime 1Q or early 2Q of 2023*.

Details

,, 25,570 SF - 3,600 SF. 21,970 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Parking Control Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents