Similar Projects
Reported | 02/14/2020 12:00 AM |
Project Title | 2020 Cemetery Improvements |
Physical Address | View project details and contacts |
City, State (County) | Hooper, UT 84315 (Weber County) |
Category(s) | Religious/Funeral |
Sub-Category(s) | Funeral Facility |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer - 01/23/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes furnishing and installing all labor, equipment and materials for the construction of approximately 530 feet of concrete curb and gutter, 260 feet of 14-foot wide asphalt roadway, 250 feet of 15-foot wide asphalt roadway, 310 feet of 18-foot wide asphalt roadway, 290 feet of 6-foot wide concrete sidewalk, 15 feet of 5-foot wide concrete sidewalk, 100 feet of concrete retaining wall, 505 feet of concrete mow strip, 500 feet of chain link fence removal and reuse in new concrete footing, 5,000 square-feet of new 6" topsoil and sod, and 340 feet of 12" Plastic Irrigation Pipe (P.I.P.) and 24" RCP storm drain line with related appurtenances and boxes. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |