Similar Projects
Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pulling Up Shoulders and Rebuilding Roads
Infrastructure
Results
SD

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Signing and Delineation
Infrastructure
Conception
$1,019,000 CJ est. value
Martin, SD 57551

Bid Packages for a Addition for the Bennett County School District 3-1
Addition, Demolition, Infrastructure - 17,678 SF
Post-Bid
$3,000,000 CJ est. value
Martin, SD 57551

Bennett County Hospital Remodel/Addition
Addition, Demolition, Renovation, Infrastructure - 19,650 SF
Bidding
$10,000,000 CJ est. value
Martin, SD 57551

Grading, Interim Surfacing
Infrastructure
Conception
$17,345,000 CJ est. value
Martin, SD 57551

Grading, Interim Surfacing
Infrastructure
Conception
$17,345,000 CJ est. value
Martin, SD 57551

Grading, Interim Surfacing, Replace Str RCBC
Infrastructure
Conception
$36,739,000 CJ est. value
Martin, SD 57551

Grading, Interim Surfacing, Replace Str RCBC
Infrastructure
Conception
$36,739,000 CJ est. value
Martin, SD 57551

Grading, Interim Surfacing, Replace Str RCBC
Infrastructure
Conception
$36,739,000 CJ est. value
Martin, SD 57551

AC Surfacing - US 18
Infrastructure
Conception
$5,708,000 CJ est. value
Martin, SD 57551

AC Surfacing - US 18
Infrastructure
Conception
$5,708,000 CJ est. value
Martin, SD 57551

Rout and Seal
Infrastructure
Bidding
$400,000 CJ est. value
Martin, SD 57551

Rout and Seal
Infrastructure
Bidding
$400,000 CJ est. value
Martin, SD 57551

Last Updated 02/11/2023 05:36 AM
Project Title

Joint and Spall Repair - US 18

Physical Address View project details and contacts
City, State (County) Martin, SD 57551   (Bennett County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $2,569,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Various Routes in the Winner Area Length 16.7 As of February 11, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Joint and Spall Repair - US 18 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents