Similar Projects
Last Updated | 07/12/2023 05:11 PM |
Project Title | Walker Street Project |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77003 (Harris County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction Commenced, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $236,198 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of July 12, 2023, the project has been awarded and construction is underway, however, information regarding the general contractor and an exact timeline for construction have not been confirmed. The work includes but is not limited to: Traffic control including, but not limited to permits, signage, flaggers, and lane closures. Demolish, remove, and dispose of concrete curbs and sidewalks and driveways at specified locations. Ref. Drawings Replace existing inlets as shown in drawings Install Bioretention as shown in drawings Install detention swale as shown in drawings Install new concrete curbs, sidewalks & driveways as needed, shown in plans Install new ADA compliant ramps as needed, shown in plans Protect existing trees Planting as shown in plans |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |