Similar Projects
RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

Material Proposal 2022 Seal Coat
Alteration
Design
Auburn, IL

Renovate the State Armory Building - Stabilization Phase
Term Contract, LEED Certification, Renovation, Infrastructure - 254,636 SF
Bidding
$17,000,000 CJ est. value
Springfield, IL 62706

Construct Storage Building Phase 1
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Springfield, IL 62703

Meter Replacement (Contract E)
Infrastructure
Sub-Bidding
$404,000 CJ est. value
Riverton, IL 62561

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Reconstruction and Shift of Brittin Road
Post-Bid
IL

FY2022 Seal Coat
Results
Springfield, IL

FY2022 Brick Street Repairs
Results
Springfield, IL

Lincoln Land Energy Center / Pawnee
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Pawnee, IL 62558

Lincoln Land Energy Center / Pawnee
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Pawnee, IL 62558

Pavement Marking on Various Routes
Infrastructure
Design
$200,000 CJ est. value
Chicago, IL 60652

Rehabilitate Runway 4/22 - Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Springfield, IL 62707

2021 Township Bituminous
Post-Bid
IL

Fabyan Parkway/Orchard Road Highway Safety Improvement
Results
Springfield, IL 62702

Last Updated 08/16/2022 08:32 AM
Project Title

Concrete Sidewalk Boardwalk Replacement

Physical Address View project details and contacts
City, State (County) Springfield, IL 62701   (Sangamon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Lincoln Home National Historic Site has a requirement to replace entry boardwalks with exposed aggregate sidewalks in Springfield, IL. See Attachment 01 for specifications. A site visit is scheduled for 10:00am CDT on 07/21/2022. See Page 36 for instructions on site visit RSVP. To submit a quote, see Section L: Instructions to Offerors on page 36. All quotes must be submitted by email to jason_burdett@nps.gov. Direct all questions regarding this RFQ to jason_burdett@nps.gov by 1400 CDT on 07/27/2022. Period of Performance: 08/01/2022 to 09/29/2022 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents