Similar Projects
Gymnasium Floor Replacement
Post-Bid
Ottawa Lake, MI

S--Flooring Installation IDIQ - Ann Arbor 506-19-1-522-0001 (VA-18-00143351)
Post-Bid
Ann Arbor, MI 48105

2018 Kent ISD Epoxy Floor Resurfacing
Results
Less than $50,352 est. value
Grand Rapids, MI

2018 Kent ISD KCTC LVT Flooring Project
Results
Grand Rapids, MI

Wyoming Senior Center - Flooring
Post-Bid
Wyoming, MI

Rudyard Area Schools High School Gym Floor Replacement
Results
Rudyard, MI

Lowell Area Schools - 2019 Summer Improvements
Post-Bid
Lowell, MI

Replacement of Carpeting Alpine Center Building
Results
Less than $24,526 est. value
Otsego, MI

Tile Floor Replacement In Edwards Township Hall
Post-Bid
West Branch, MI 48661

Women's Huron Valley Correctional Facility Replace Gym Floor
Results
Less than $98,668 est. value
Ypsilanti, MI

Removal Of Mercury Catalyzed Flooring And Install Vaporized
Post-Bid
Fife Lake, MI

USCG Housing Carpet Installation
Results
Sault Sainte Marie, MI 467832021

2019 Evergreen Chapel Repair
Post-Bid
Alpena, MI

Flooring Improvements at Central and Emerson Elementary Schools
Results
Owosso, MI

62B District Court Occupied Carpet Replacement
Post-Bid
Kentwood, MI

Reported 01/16/2019 12:00 AM
Project Title

Replace Flooring at 3610 Wah Be Noong

Physical Address View project details and contacts
City, State (County) Harbor Springs, MI   (Emmet County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. The Contractor shall obtain the necessary equipment and supplies to accomplish the task of replacing flooring for entire unit of 3610 Wah Be Noong Circle, Harbor Springs. Equipment must be in working order to accomplish the contract obligations. LTBB to provide supplies. Call for appointment to see unit for specific room sizes. 2. Must work with LTBB Housing to schedule with tenant to provide notice prior to work starting. 3. Evaluate condition of existing tile in kitchen and bath,save if possible. 4. Supply Commercial grade vinyl plank flooring according to LTBB Housing Director's specification. 5. Move appliances, cabinets,fixtures and furniture to access floors. 6. Remove existing flooring from Entire unit floor and replace subfloor as needed. 7. Remove and Reinstall trim, molding, and replace threshold. 8. Provide before and after photos of project. 9. Clean, remove, and dispose of all debris resulting from this project. 10 Contractor shall be responsible to make any repairs in areas where Contractor's equipment damages said areas i.e. walls, doors, cabinets, etc
Details
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents