Similar Projects
Timber Bluffs Acres Phase I and II
New Construction
Conception
Eau Claire, WI 54701

Hodag Park Music Gazebo
New Construction, Infrastructure - 220 SF
Bidding
$260,000 est. value
Rhinelander, WI 54501

Aeration Basin 11S Isolation Valve Replacement and Effluent Reuse Piping Repairs
Renovation
Bidding
Milwaukee, WI 53207

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Timeless Timber Site Commercial Redevelopment
Post-Bid
Ashland, WI 54806

East Park Commerce Center - Phase 1
Results
Stevens Point, WI 54481

Aeration System Upgrades
Results
South Wayne, WI 53587

Haribo Candy Manufacturing Plant
New Construction - 575,266 SF
Construction
$300,000,000 est. value
Kenosha, WI 53142

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

Baraboo and Reedsburg Facilities
New Construction, Infrastructure - 164,640 SF
Bidding
$10,000,000 CJ est. value
Baraboo, Reedsburg, WI 53913

CVTC TEC Phase 1 Parking Lot
New Construction
Post-Bid
Eau Claire, WI 54703

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

Biosolids Drying, UV Disinfection and WPCF Upgrades
Renovation
Bidding
Beloit, WI

Refrigerator/Freezer Install/Remove/Replace
Term Contract
Post-Bid
Racine, WI 53402

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Last Updated 02/09/2022 03:46 PM
Project Title

WWTF Upgrade 2021

Physical Address View project details and contacts
City, State (County) Dickeyville, WI   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work: the project consists of a new chemical building, installation of a new positive displacement rotary lobe sludge pump, submersible scum and return activated sludge pumps, construction of a new sludge storage tank, a new effluent monitoring structure, piping, site improvements including fencing and paving, plumbing, HVAC, electrical, and SCADA improvements.

Details

Sewage Treatment Plant, Renovation.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents