Similar Projects
West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Results
$10,000,000 est. value

East Meadow Subdivision Drainage Improvements Project
Infrastructure
Post-Bid
Zachary, LA

Arch Pipe and Bands
Infrastructure
Results
Baton Rouge, LA

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Clear Waterways
Infrastructure
Post-Bid
Baker, LA

BREC: Greenwood Multi-Use Trail, Phase 2
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
LA

Drainage Project East Buffwood to Cypress Bayou
Infrastructure
Post-Bid
Baker, LA

Cameron Creole Maintenance Project
Term Contract
Post-Bid
$91,000 est. value
Baton Rouge, LA

DOTD Clamp Mount Assy Round Post Pipe
Infrastructure
Post-Bid
Baton Rouge, LA

M/V New Roads - 2021 Uscg Drydock
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Drainage Project - South Magnolia to Cypress
Infrastructure
Post-Bid
Baker, LA

Annual Storm Water Concrete Lined Canal Repair
Term Contract
Post-Bid
$1,000,000 est. value
Baton Rouge, LA

Mancuso Lane Drainage Improvements City Parish Project
Infrastructure
Post-Bid
Baton Rouge, LA

DOTD Pipe, Culvert, Plastic, PVCP(D07)
Infrastructure
Results
Baton Rouge, LA

Drainage Project - Parkwood Terrace to Morvant
Alteration
Post-Bid
Baker, LA

Last Updated 02/25/2022 03:38 PM
Project Title

Mississippi River and Tributaries Project (MR&T), Atchafalaya Basin Levee District (ABLD)

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA   (East Baton Rouge County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) The MRL Armoring near Morganza Project will consist of repair the failed levee sections on the Morganza South Guide Levee along Baseline Stations 275+00 to 335+00, and multiple erosion locations along the Mainline MRL between stations 1002+00 to 1022+00 and 1313+69 to 1369+69. The sections will be replaced with adjacent excavated and new embankment material. New fill material may need to be processed with the excavated material to construct the levee back to its original slope. Once completed, construction of approximately 13,600 LF of Articulated Concrete Blocks (ACBs) and geotextile separator fabric will placed along the levee slope from EL. 60 FT to 15 FT past EL. 49 FT at Baseline Stations 1313+69 to 1369+69 and 275+00 to 335+00 and from EL. 60 FT to 15 FT past the levee toe at Baseline Stations 1002+00 to 1022+00. The ACBs will be anchored into the levee slope at the top and bottom limits of the levee slope in an anchor trench which will be backfilled and compacted. It is expected that heavy construction equipment such as excavators and bulldozers will be used to repair the levee slope, prepare the surface and excavate the anchor trench. A crane will be used along Highway 1 and the levee crown for the placement of the ACB mats. Once all construction is completed, the levee and disturbed areas will be fertilized and seeded for turf establishment.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents