Similar Projects
Pedestrian Crossing Improvements at Royalgate and Military Drive
Bidding
San Antonio, TX 78242

Annual Contract for Landscaping and Irrigation System(s) Inspections, Maintenance, and Repair Service - BESD
Term Contract
Bidding
San Antonio, TX

Annual Contract for Top Soil and Top Dressing
Post-Bid
San Antonio, TX 78283

Landscaping Maintenance Services Judson ISD
Post-Bid
Live Oak, TX 78148

BASH Pesticide Application
Results
San Antonio, TX

New Asphalt Parking Lot at 811 Jackson Street
Results
Less than $88,075 est. value
San Antonio, TX 78200

Walking Track - Copperfield Elementary School
Post-Bid
Converse, TX 78109

Concrete Repair and Replacement
Term Contract
Results
Schertz, TX 78154

Lawn Maintenance Services for ASR and Wastewater Treatment Plant Properties
Post-Bid
San Antonio, TX 78200

Maverick Creek Trail Connection
Results
$1,700,000 est. value
San Antonio, TX 78205

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Annual Contract for General Easement and Brush Clearing
Term Contract
Results
San Antonio, TX 78212

Annual Contract for Supply of Trees - 30 Gallon
Term Contract
Post-Bid
San Antonio, TX 78283

FY 2020 Flatwork TOC Package 6
Results
$2,500,000 est. value
San Antonio, TX 78205

Annual Contract for Lawn Maintenance Services for Non-Escort Saws Lift Station Properties
Term Contract
Post-Bid
San Antonio, TX 78212

Last Updated 04/01/2020 11:07 AM
Project Title

Salado Trailhead at East Commerce

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78220   (Bexar County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping/Irrigation, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $675,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The E. Commerce Street Trailhead consists of twenty nine parking stalls at a new trailhead with a 10’ wide concrete trail connection to South Salado Creek Greenway Trail. The parking stalls will be low impact development (LID) strategy of gravel with permeable pavers and concrete driveway. Trailhead amenities like a drinking fountain, signage and minor landscaping.

Details

Division 10 - Specialties, Signage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents