Similar Projects
Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

Starling Development - Phase 3
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Kalispell, MT 59901

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

East 2nd Street Hotel
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Whitefish, MT 59937

Clarks Fork - 9 Miles South of Belfry
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Belfry, MT 59008

Roberts Sewer Service Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Roberts, MT 59070

Great Falls Water Treatment Plant Solids Mitigation Improvements
Addition, Renovation, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Great Falls, MT 59405

Region Four Headquarters Front Desk Security
Renovation, Alteration
Post-Bid
$78,000 est. value
Great Falls, MT

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Lake McDonald Utility Relocation
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Kalispell, MT

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Creekside Commons
New Construction, Infrastructure
Pending Verification
$13,579,200 CJ est. value
Kalispell, MT 59901

Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Last Updated 12/02/2022 10:37 AM
Project Title

Office Building for the Lake County Weed Department

Physical Address View project details and contacts
City, State (County) Polson, MT 59860   (Lake County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2021 , Construction documents
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 17,2020 No bids received. No definite date for the rebid. The Commissioners are requesting proposals for an office building for the Lake County Weed Department. Following are some minimum requirements: Approximately 1200 sq. ft. Concrete Foundation or Concrete Slab 2 Offices - Approximately 140 sq. ft. 1 Office/Reception Minimum 140 sq. ft. Waiting Area for Chairs 2 Unisex Handicap Restrooms One with Shower Conference Room Kitchenette Refrigerator Microwave Stove Wall Construction 6" - 16" OC R19 Insulation 1/2" Sheetrock, Taped & Textured Interior Roof Construction 80 lb. Snow Load 2x4 Truss Asphalt or Metal Roofing 4/12 Pitch Energy Efficient Windows Minimum Double Pane Glass No Metal Frames If have any questions contact Commissioner Bill Barron at 406-883-7204 or email lakecommissioners@lakemt.gov.

Details

1,480 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents