Project Title | Sand Hill River Watershed District - Addition |
Physical Address | View project details and contacts |
City, State (County) | Fertile, MN 56540 (Polk County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of 03/17/2023 All bids were rejected. The Work consists of single prime contracts comprises the Project for the construction of general construction and Mechanical and Electrical Sub-bidders for a B type Occupancy addition, l493sf footprint (2012 total sf) attached to the owners present building(2912 total sf). Utilities electrical, water, sanitary sewer and natural gas lines serving the addition and existing building will re-routed and re-connected due to the construction of the addition. In addition site work consists of walks, parking slab, curb and gutter at the street. The existing building will be in continuous operation during the additions construction requiring power, communications and HVAC. All Bidding period questions and requests for information or approved equals will be directed to: YHR Partners 420 Main Ave Moorhead, MN 56560 218/233-4422 richard.meier@yhr.com (when using email, place Sandhill in subject line) The Owner reserves the right to waive any informalities or to reject any or all bids and to accept the bid, which in the Owners judgment is in their best interest. Bid Bond will be required in order to submit a bid for the work included in this Bid package. Each bidder shall be prepared upon bid acceptance and contract award, within ten days after notice of award, to execute and effect a contract in accordance with the terms of these specifications. Performance/Payment bond is required in the full amount of the bid at the award of the contract The Architect and Contractors offices assume no responsibility for receiving and delivering contractor proposals to the bid opening. Bidders shall carefully examine entire contents of Contract Documents prepared for the work to become thoroughly familiar with all requirements. Bidders shall visit the construction site (contact Owner as to availability) to obtain first-hand knowledge of existing conditions, including existing utilities and services, obstacles, which may be encountered, and all other conditions relative to the work to be performed. Contractors shall not receive extra payments for conditions that can be determined by examining the site and the contract documents. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |