Similar Projects
Last Updated | 04/06/2020 02:07 PM |
Project Title | Repair Rehabilitate Clodine Ditch, Buffalo Bayou and Tributaries Flood Control, Harris County, Texas |
Physical Address | View project details and contacts |
City, State (County) | TX (Harris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13). General Description: Rehabilitate Clodine Ditch as it runs along Barker dam. Sections of slope have failed and need to be repaired and lined similar to other sections of the ditch with articulated concrete mat. Several back slope drains have failed and need repair/replacement. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |