Last Updated 04/06/2020 02:07 PM
Project Title

Repair Rehabilitate Clodine Ditch, Buffalo Bayou and Tributaries Flood Control, Harris County, Texas

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13). General Description: Rehabilitate Clodine Ditch as it runs along Barker dam. Sections of slope have failed and need to be repaired and lined similar to other sections of the ditch with articulated concrete mat. Several back slope drains have failed and need repair/replacement.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents