Last Updated 07/15/2020 08:44 AM
Project Title

Intersection Improvement - US 278/SC 300

Physical Address View project details and contacts
City, State (County) SC   (Barnwell County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Mobilization - Subcontractor 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Traffic Control 1.000 Ls Cpm Progress Schedule 1.000 Ls Clearing & Grubbing Within Right Of Way 1.000 Ls Removal & Disposal Of Existing Drop Inlet 5.000 Ea Removal & Disposal Of Existing Asphalt Pavement 2,710.000 Sy Unclassified Excavation 10,177.000 Cy Borrow Excavation 10,891.000 Cy Muck Excavation 1,150.000 Cy Geotextile, Separation 560.000 Sy Geogrid Stabilization 560.000 Sy Stone Bridge Lift Material 195.000 Ton Granular Bridge Lift Material 195.000 Cy Fine Grading 11,455.000 Sy Maintenance Stone 1,100.000 Ton Hot Mix Asphalt Base Course - Type a 2,846.000 Ton Liquid Asphalt Binder Pg64-22 380.000 Ton Full Depth Asph. Pav. Patching 8" Unif 1,713.000 Sy Milling Existing Asphalt Pavement (Variable) 3,142.000 Sy Milled-In Rumble Strip 2.000 Mi Hot Mix Asphalt Intermediate Course Type b 2,514.000 Ton Hot Mix Asphalt Surface Course Type b 2,319.000 Ton Permanent Construction Signs (Ground Mounted) 352.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 660.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 17,426.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 68.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 6.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 1,204.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 22,628.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 330.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 8,713.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 68.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 6.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 5.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 602.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 11,314.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 212.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 6.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 60.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 151.000 Ea Flat Sheet, Type Iii, Fixed Sz. & Msg. Sign 462.000 Sf Flat Sheet, Type Iii, Size Determined By Msg 76.500 Sf u-Section Post For Sign Supports - 2p 10.000 Lf u-Section Post For Sign Supports - 3p 134.000 Lf u-Section Post For Sign Bracing - 2p 21.000 Lf Square Tubing Post 12 Gauge - 2" x 2" x 8 856.000 Lf 18" Smooth Wall Pipe 2,279.000 Lf 24" Smooth Wall Pipe 91.000 Lf 30" Smooth Wall Pipe 108.000 Lf Catch Basin -Type 1 Cb - Type 1 2.000 Ea Catch Basin -Type 16 1.000 Ea Catch Basin -Type 17 5.000 Ea Drop Inlet (24" x 24") 1.000 Ea Beveling Of Pipe End 10.000 Ea Concrete Curb And Gutter(2`-0") Sloping Face 1,170.000 Lf Concrete Driveway(6" Uniform) 864.000 Sy Rip-Rap (Class a) 62.000 Ton Rip-Rap (Class b) 349.120 Ton Geotextile For Erosion Control Under Riprap(Class 2)Type b 593.940 Sy Mt3 Leading End Treatment Tl3 2.000 Ea Mgs3 Gr Standard Shoulder 212.500 Lf Temporary Barrier Fence 875.000 Lf Right Of Way Marker(Rebar And Cap) 37.000 Ea Right Of Way Plat 1.000 Ls Permanent Cover 5.177 Acre Temporary Cover 2.589 Acre Fertilizer (Nitrogen) 517.720 Lb Fertilizer (Phosphoric Acid) 517.720 Lb Fertilizer (Potash) 517.720 Lb Agricultural Granular Lime 10,354.400 Lb Selective Watering 135,750.000 Gal Mowing 15.532 Acre Turf Reinforcement Matting (Trm) Type 1 0.165 Msy Temporary Erosion Control Blanket (Ecb) 7.826 Msy Hydraulic Erosion Control Product (Hecp) - Type 1 1.763 Acre Hydraulic Erosion Control Product (Hecp) - Type 3 1.763 Acre Hydr.Eros.Contrl.Prod.(Hecp) - Type 1 As Tracer Under Trm 1.651 Acre Inlet Structure Filter - Type f (Weighted) 80.000 Lf Inlet Structure Filter- Type f (Non-Weighted) 80.000 Lf Sediment Tubes For Ditch Checks 258.000 Lf Silt Fence 4,197.396 Lf Replace/Repair Silt Fence 719.740 Lf Silt Basins 914.810 Cy Cleaning Silt Basins 2,131.610 Cy Removal Of Silt Retained By Silt Fence 1,049.349 Lf Inlet Structure Filter - Type b 1.000 Ea Aggregate No.5 Or 57 For Erosion Control 11.235 Ton Stabilized Construction Entrance 1,100.000 Sy

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents