Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

Glens Path Project - Phase 2
Infrastructure
Design
$200,000 CJ est. value
Woodside, CA 94062

Glens Path Project - Phase 2
Infrastructure
Design
$200,000 CJ est. value
Woodside, CA 94062

Replace Culvert, Drainage and Erosion Control
Infrastructure
Bidding
$18,000,000 CJ est. value
Belmont, CA 94002

Replace Culvert, Drainage and Erosion Control
Infrastructure
Bidding
$18,000,000 CJ est. value
Belmont, CA 94002

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Replacement of 8-Inch Pipeline Under Pilarcitos Creek (Strawflower) Project
Alteration
Post-Bid
$372,000 est. value
Half Moon Bay, CA 94019

Skyline Water Tank Replacement Project
Infrastructure
Results
Millbrae, CA 94030

Aboveground and Underground Storage Tanks Monitoring, Maintenance, Testing, and Repair Services
Term Contract
Results
Less than $500,000 est. value
Redwood City, CA 94063

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Cypress Avenue Residential Campus
New Construction, Infrastructure - 1,500 SF
Pending Verification
$38,000,000 CJ est. value
South San Francisco, CA 94080

Millbrae Serra Station
New Construction, Infrastructure - 294,000 SF
Pending Verification
$460,000,000 CJ est. value
Millbrae, CA 94030

Permanent Emergency Bypass Transmission Main on East Third Avenue (FY 2025-2026) - WA-04 - City of Foster City
Infrastructure
Conception
$300,000 est. value
Foster City, CA 94404

Repair a Damage Storm Drain System and Rebuild Nearby Eroded Embankment
Infrastructure
Design
$1,092,000 est. value
Half Moon Bay, CA 94019

Last Updated 09/08/2022 06:04 PM
Project Title

Main City Recycled Water Tank and Pump Station - City of Redwood City

Physical Address View project details and contacts
City, State (County) Redwood City, CA 94063   (San Mateo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $8,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plan, design and construct a new recycled water tank and pump station to reliably provide recycled water to the Main City Recycled Water Service Area. Project is included in the City of Redwood City's FY 2022 - 2027 CIP. As of September 8, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated from 2022 to FY 2026/2027.* A firm timeline for construction has not been determined, however construction is anticipated to be completed by the end of FY 2026/2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents