Similar Projects
Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Bailey Park Development - #33032784 - City Of Lees Summit
New Construction, Renovation, Infrastructure
Conception
$7,500,000 CJ est. value
Lees Summit, MO 64063

Range Usa
New Construction - 14,650 SF
Design
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO

Kids Empire
New Construction - 15,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Ballwin, MO 63011

RFP Engineering - Kiwanis Park
New Construction, Infrastructure
Bidding
$726,000 CJ est. value
Moberly, MO 65270

Conservation HQ Early Work Renovations
Renovation
Bidding
$1,500,000 CJ est. value
Saint Louis, MO 63138

COSMO Park Shelter Improvements
New Construction
Post-Bid
Columbia, MO 65202

Tuff Shed for Parks Barn
Renovation
Post-Bid
$130,000 est. value
Des Peres, MO 63131

Hidden Valley Concession
New Construction
Results
Blue Springs, MO 64015

Perry (Ralph and Martha) Memorial Conservation Area Range Complex Renovation, Recycling, and Soil Stabilization
Renovation, Infrastructure
Results
$1,000,000 to $1,250,000 est. value
Sweet Springs, MO

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

Msp Development Expansion
New Construction
Pending Verification
Jefferson City, MO

Family Room
Build-Out - 1,272 SF
Pending Verification
Columbia, MO 65212

Keystone Park Improvements - PR-13-22 - City of Blue Springs
Renovation
Conception
$1,200,000 CJ est. value
Blue Springs, MO 64014

Gateway South Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Design
$1,200,000,000 CJ est. value
Saint Louis, MO 63102

Last Updated 04/27/2023 01:31 PM
Project Title

Replacement of Latrine and Shower Facilities Monett Readiness Center

Physical Address View project details and contacts
City, State (County) Monett, MO 65708   (Barry County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $670,166 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes replacement of latrine and shower facilities at the Monett Readiness Center. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. In addition to the State of Missouri MBE/WBE/SDVE participation goals set forth herein and in the bid documents for this project, the contractor on a federally funded/assisted construction project is subject to federal Executive Order 11246. The Bidder's attention is drawn to the Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity (Executive Order 11246, 41 C.F.R. 60- 4.2) in Section 007333, SUPPLEMENTARY GENERAL CONDITIONS FOR FEDERALLY FUNDED/ASSISTED CONSTRUCTION PROJECTS, which is incorporated by reference. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. This is a federally funded/assisted construction project that requires compliance by the awarded contractor with applicable federal laws and regulations. The Bidder should review Section 007333, SUPPLEMENTARY GENERAL CONDITIONS FOR FEDERALLY FUNDED/ASSISTED CONSTRUCTION PROJECTS, which is made part of this solicitation and will be made part of the resulting contract by reference. MBE - 12.7% WBE - 6.9%

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents