Similar Projects
Mills/Jarrett Building - 1st and 2nd Floor Lighting Improvement(s)
Renovation
Design
$125,000 CJ est. value
Columbia, SC 29201

AMI Water Meter Installation
Infrastructure
Sub-Bidding
$535,250 CJ est. value
Columbia, SC 29201

Solar Energy Installation Services
Renovation
Sub-Bidding
$200,000 CJ est. value
Columbia, SC 29201

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Hayne Lab Backup Generator
Alteration
Post-Bid
$1,500,000 to $1,750,000 est. value
Columbia, SC 29223

MTC Regional Training Institute Lighting Upgrades
Results
$100,000 to $300,000 est. value
Eastover, SC 29044

2nd Floor Lighting Replacement
Alteration
Results
$175,000 to $225,000 est. value
Columbia, SC 29201

Myers Emergency Lighting Inverter System Replacement of Batteries
Term Contract
Post-Bid
Columbia, SC 29223

Inspections, Maintenance and Repair Services of District Generators
Term Contract, Alteration
Results
Columbia, SC

Generator Maintenance Services
Term Contract
Post-Bid
Allendale, Beaufort, Columbia, Eastover, Florence, Greenville, Plum Branch, Sumter, SC 29605

Koger Center Interior Stage Power Upgrades
Alteration
Results
$80,000 to $100,000 est. value
Columbia, SC 29201

CFSH Secondary Power Line Relocation Phase I McLendon
Alteration
Post-Bid
$100,000 to $120,000 est. value
Columbia, SC 29203

Generators Preventative Maintenance for SCDPS
Term Contract
Results
Blythewood, Florence, Greenville, Greenwood, SC 29016

Lighting Work at Flora 2nd Floor-East End
Alteration
Post-Bid
$125,000 to $150,000 est. value
Columbia, SC 29201

Replace 40 FT Wood Pole
Alteration
Results
Columbia, SC 29210

Last Updated 04/24/2023 04:17 PM
Project Title

WRJA Tower Lighting and Installation

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $101,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 24, 2023, this project has been awarded to Education Television Network for $ 101,500.00** Direct Inquiries To: KAYLA MIDDLETON QUIRE SERVICES and SUPPLIES / EQUIPMENT (MODIFIED) It is the intent of the State of South Carolina, by and through its State Fiscal Accountability Authority, Office of State Procurement to solicit proposals on behalf of the Education Television Network (ETV). ETV is seeking a Contractor to provide tower lighting and equipment installation services for the WRJA tower in the City of Sumter, Sumter County, South Carolina. SCOPE OF WORK/SPECIFICATIONS The South Carolina Education Television Network (ETV) is seeking bids from Contractors to provide tower lighting equipment and installation services to a new LED system with updated monitoring capabilities and current updated flash technology. A. System Requirements 1. All lighting must be LED system. 2. Specifications must follow the current FAA Advisory Circulars. 3. The system shall have one control box per beacon. 4. System shall consist of: a. Seven beacons. b. Five-thousand four hundred thirty-three feet (5,433) of interconnecting (armored) wire. c. All hardware for mounting beacons, securing cable to tower legs, and mounting control boxes to interior wall. d. One flash control box per beacon, containing all hardware necessary for proper operation/installation. e. Twenty-five (25) feet of interconnect wiring for control box to control box to synchronize operation. 5. Control boxes must be interconnectable to provide synchronous flash of beacons. 6. The system provided shall include programmable, open/close dry contacts to connect to our already existing remote monitoring alarm system. 7. The manufacturer shall provide a five-year minimum warranty on all supplied parts. 8. All components shall be delivered as one shipment, to South Carolina ETV at 1041 George Rogers Blvd. Columbia, SC (South Carolina) 29201. 9. Spare parts included with the system shall consist of at a minimum one "Flash Head" and "Flash Controller Card". 10. Power/Control cabling shall be run in a manner that does not interfere with climbing face of the ladder or overlap/infringe/or trap any other previously installed coax, conduit, cabling, or equipment. B. Contractor Requirements 1. The Contractor shall provide all currently employed personnel with climbing gear necessary for safe and Occupational Safety and Health Administration/American National Standards Institute (OSHA/ANSI) approved climbing and rigging techniques and practices to include but not limited to: (Two leg full-body fall arrest harnesses, Ylanyards, safety glasses, load rated blocks/straps/shackles/ropes/cables/winch(s)/steel-toe boots/shoes, Helmets, etc.). 2. The Contractor shall be responsible for providing OSHA/ANSI approved rigging plan and load assessment. 3. The Contractor shall be responsible for all preparation of loads and equipment being raised or lowered during both the removal of old equipment and installation of new equipment. 4. The Contractor shall be responsible for ensuring all existing hardware and equipment not pertaining to this lighting contract is not damaged or altered. (including but not limited to: antenna's, coax, conduit, snap-ins, butterflies and mounting brackets). 5. The Contractor shall remove existing lighting fixtures, power/control cabling, and lighting components currently mounted on the tower before installing all the new lighting fixtures, power/controller cabling, beacon mounting plates, and additional hardware pertaining to the new lighting system.6. The Contractor shall use weatherproofing specified by the lighting supplier. 7. The Contractor shall support and tie-in a power/control cable using method specified by the lighting supplier. Question Deadline 03/09/2023 at 5:00 PM ET

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents