Similar Projects
71St Aux Cafeteria A/C Replacement
Alteration
Bidding
Fayetteville, NC 28304

Replacements at TC Berrien Elementary School
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28301

College Lakes Elementary Kitchen A/C
Post-Bid
Fayetteville, NC 28311

Hope Mills Middle Auditorium Compressor Replacement
Post-Bid
Hope Mills, NC 28348

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Westover High School HVAC Infrastructure Phase II
Results
Fayetteville, NC 28303

ERC 10 Ton A/C Replacement
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28306

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

Armstrong Gym A/C Replacements
Alteration
Bidding
Eastover, NC 28312

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Hope Mills Middle Locker Room HVAC Addition
Results
Less than $17,333 est. value
Hope Mills, NC 28348

Remove and Replace Small A/C Units at Cape Fear High School
Alteration
Bidding
Fayetteville, NC 28312

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

Reported 07/07/2021 12:00 AM
Project Title

EE Smith Science Class Rooms AC Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove and dispose of existing 15 ton air handler, hot water coil and condenser. The contractor shall install a new 15 ton condenser, thermostat and matching air handler with a 300,000 Btu hot water coil. The contractor shall provide and install new service disconnects, conduit, and power wiring to the condenser and air handler. The contractor shall connect the new hot water coil to existing piping. The contractor shall cap off the existing non used piping to the old air handler. The contractor shall install new copper line set from the air handler to the condenser. All work will be done to local codes.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents