Similar Projects
Last Updated | 03/21/2022 07:06 AM |
Project Title | San Diego/Rosita Creek Site 2, Dam Repair |
Physical Address | View project details and contacts |
City, State (County) | TX (Duval County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $100,000 to $250,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The concrete plunge basin’s right side slope section has been displaced and is lying upside down in the basin floor. The mesh reinforcing steel is exposed, and it is obvious that the reinforcing steel was not placed in the center of the slab. There are trees and brush growing in the displaced section. There is a large tree growing on the left side and in line with the 48-inch conduit outlet. |
||||||
Details | Dam/Tunnel, Renovation.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |