Similar Projects
FY 22 Cedar Bayou Pa 6 Dike Raise, Chambers County, TX
Term Contract
Design
$1,000,000 to $5,000,000 est. value
TX

Tilting Weir Gate Construction
Infrastructure
Bidding
TX

S.W. Freese Dam Repairs
Renovation
Bidding
$7,485,000 est. value
TX

Sister Grove Regional Water Resource Recovery Facility Outfall Pipeline 1 - Solicitation Set 01 - Large Diameter Tunnel Work and Large Diameter Pipe Materials
Post-Bid
TX

LBCR Dam and Intake Project - Proposal Purchase Package 6B - Barrier and Warning System
Post-Bid
$350,000 est. value
Honey Grove, TX 75098

Houston Ship Channel, Mid Bay Placement Area (PA) Improvements
Results
$5,000,000 to $10,000,000 est. value
TX 77571

Western Dams Inspection and Design Services White Rock Dam Maintenance Project
Results
Dallas, TX 75214

Lake Ralph Hall: Leon Hurse Dam
Construction
$135,000,000 to $165,000,000 est. value
TX

Elm Creek (Cen-Tex) Watershed - Site 23 Rehabilitation
Renovation
Bidding
$1,000,000 to $4,000,000 est. value
TX

FY21 Houston Ship Channel Spilman Placement Area Improvements
Post-Bid
TX

Lake Dunlap Spillgate Replacement and Dam Armoring
Results
Less than $34,796,044 est. value
Seguin, TX 78155

Starcke Dam Trash Rack Refurbishment
Renovation
Bidding
Marble Falls, TX 78654

Sabine Neches Waterway Pa8 Containment Dike Raise In Jefferson County, Texas
Post-Bid
$1,000,000 to $5,000,000 est. value
Port Arthur, TX

Wirtz Dam Floodgates Ph. II
Results
Austin, TX 78767

Chocolate Bayou, Texas Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Brazoria, TX

Last Updated 03/21/2022 07:06 AM
Project Title

San Diego/Rosita Creek Site 2, Dam Repair

Physical Address View project details and contacts
City, State (County) TX   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The concrete plunge basin’s right side slope section has been displaced and is lying upside down in the basin floor. The mesh reinforcing steel is exposed, and it is obvious that the reinforcing steel was not placed in the center of the slab. There are trees and brush growing in the displaced section. There is a large tree growing on the left side and in line with the 48-inch conduit outlet.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents