Similar Projects
Grease Traps and Lift Station Maintenance with Septic Tank Pump Outs
Renovation, Infrastructure
Bidding
Orlando, FL

Construction of Lift Station 1 Relocation
New Construction
Post-Bid
Maitland, FL

Fort Gatlin Lift Station
New Construction, Infrastructure
Post-Bid
Orlando, FL

Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Results
Less than $18,954,291 est. value
Winter Garden, FL 34787

Orange County Utilities Pump Station Package 40
Results
$2,068,770 est. value
FL

Clarcona Park Lift Station and Electrical Upgrades
Results
Less than $750,000 est. value
Apopka, FL 32703

Utilities Pump Station Improvements Package 21
Results
Less than $2,487,000 est. value
FL

Moss Park Lift Station and Electrical Upgrades
Results
$1,400,000 est. value
Orlando, FL 32832

Utilities Pump Station Improvements Package 24
Results
$2,160,127 est. value
Belle Isle, Orlando, FL 32812

Utilities Pump Station Improvements Package 32
New Construction
Results
$3,655,000 est. value
Orlando, FL

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Building
New Construction
Results
$2,111,384 est. value
Orlando, FL 32819

Southwest Marriott Pump Station Odor Control System
New Construction
Results
$1,191,680 est. value
Orlando, FL 32885

Utilities Pump Station Improvements Package 34
Renovation
Results
$2,315,584 est. value
Orlando, FL

Refurbish and Upgrade the Unit 2 Pump Station
Renovation
Results
$350,000 est. value
Apopka, FL 32704

Oakland Lift Station No. 6 and Force Main Improvements
Renovation, Infrastructure
Results
$475,200 est. value
Oakland, FL 34760

Reported 05/13/2022 12:00 AM
Project Title

Bill Frederick Park Lift Stations Upgrades

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,120,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope includes Improvements of 5 (five) Lift Stations and complete removal and replacement of 1 (one) Station, all within the park. Read Summary of Work (Section 01010) for a better understanding of the sequence and time to perform work.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents