Similar Projects
Alleghany Road Distribution Center
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Corfu, NY 14036

Excelsior Energy Center
New Construction, Infrastructure
Design
$345,550,000 CJ est. value
Batavia, NY 14020

Alleghany Road Multi-Residential Development
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Corfu, NY 14036

Batavia WTP Priority Improvements - Procurement
Infrastructure
Bidding
$500,000 CJ est. value
Batavia, NY 14020

Oakfield-Alabama CSD 2020 Capital Improvements
Renovation
Post-Bid
$15,300,000 est. value
Oakfield, NY 14125

Batavia CSD 2020 - Vision Capital Improvement Project Phase 2 - 2021-2022 Capital Outlay Project
Renovation
Post-Bid
$2,200,000 est. value
Batavia, NY 14020

2020 Capital Improvement Project Contract 105: Site Work
Infrastructure
Results
$1,857,000 est. value
Alexander, NY

Pavilion Webster Central School District (CSD) - 22-23 Capital Outlay Exception Project
Renovation
Results
$184,600 CJ est. value
Pavilion, NY 14525

Plug Power
New Construction, Infrastructure
Construction
$290,000,000 CJ est. value
Alabama, NY 14013

Ivy Village Senior Apartments
New Construction, Infrastructure - 105,935 SF
Pending Verification
$22,000,000 CJ est. value
Le Roy, NY 14482

Cider Solar Farm
New Construction, Infrastructure
Pending Verification
$550,000,000 CJ est. value
Elba, NY 14058

Main Road Solar
Infrastructure
Design
$11,000,000 CJ est. value
Le Roy, NY 14482

Pembroke CSD 2021 Capital Improvements
Renovation
Post-Bid
$2,200,000 est. value
Corfu, NY 14036

Culvert Rehabilitations, Drainage Repairs and Miscellaneous Work
Infrastructure
Results
$2,167,958 CJ est. value
Batavia, NY 14020

Cider Solar Farm
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Oakfield, NY 14125

Last Updated 04/27/2023 03:33 AM
Project Title

2021 Capital Improvement Project - Phase 2 - Contract 100 - Site Work Contract

Physical Address View project details and contacts
City, State (County) Corfu, NY 14036   (Genesee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $439,300 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of Education hereby reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the school district. All RFIs should be directed to the Campus Construction Management Group Inc., to the attention of Allison Thomson, Project Manager, via e-mail: athomson@campuscmg.com. A Bid Bond or Certified Check made payable to the Owner in the amount of five percent of the Bid, subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that, in the case the contract is awarded to him, he will then, ten days thereafter,execute such contract and furnish a satisfactory Performance and Payment Bond, and the Bidder shall not withdraw his Bid for a period of forty-five days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. Attention of the Bidders is called to the requirements as to the conditions of employment and minimum wage rates to be paid under this Contract as well as to other provisions set forth in the Instruction to Bidders. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed. Contract Documents will be available. In lieu of shipping, Contract Documents may be obtained in person at Rotolite-Elliot Corporation, 1 Grove Street, Pittsford, NY 14534. Phone (585) 385-2190. In lieu of paper bid sets, bidders can view electronic plans and specifications online upon a $49 nonrefundable payment by visiting electronically. Bid sets will not be available at SEI Design Groups offices. Bids shall be on the form provided in the documents, prepared in triplicate as set forth in the Instructions to Bidders and enclosed in an envelope bearing on its face the name and address of the bidder and the title of work to which the proposal relates. If submitting for more than one contract, submit each contract bid in separate envelope. Any Plan Holder upon returning such set in good condition within fifteen (15) days after Bid opening will be refunded the deposit. Any Plan Holder after fifteen (15) days after Bid opening so returning such a set will be refunded 50 percent of the deposit. The Instructions to Bidders, Form of Proposal, General Conditions, Drawings, and Specifications may be examined at the offices of the Owner, the Architect. All RFIs should be directed to the Campus Construction Management Group Inc., to the attention of Allison Thomson, Project Manager, via e-mail: athomson@campuscmg.com.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents