Similar Projects
Bondecroft Elementary School Addition
Addition
Conception
Sparta, TN 38583

Gym and Safety Renovations - Richland Elementary School
Renovation
Conception
$5,000,000 est. value
Memphis, TN 38120

Virtual School Offices Build Out
New Construction, Renovation, Addition, Build-Out
Design
$4,000,000 est. value
TN

Newport Grammar School Interior Renovation
Renovation
Design
$500,000 est. value
Newport, TN 37821

Licensed General Contractor
Renovation
Bidding
$223,000 est. value
Cookeville, Gainesboro, TN 38562

New Secure Entrances
Renovation
Bidding
$3,500,000 CJ est. value
Gainesboro, TN 38562

Refrigeration Repairs for Walk-In Cooler and Freezer CNC
Renovation
Sub-Bidding
$200,000 CJ est. value
Memphis, TN 38103

Turf Maintenance and Repair - Rebid
Term Contract
Sub-Bidding
Memphis, TN 38103

District-wide Improvements
Renovation
Post-Bid
Sneedville, TN

Greene County Schools Improvement
Renovation
Post-Bid
Afton, Greeneville, Mosheim, TN 37745

Northwest Elementary School
New Construction
Results
Knoxville, TN

Dogwood Elementary School Outdoor Classroom
New Construction
Results
Germantown, TN 38139

Lightbridge Academy
New Construction - 10,568 SF
Construction
$2,840,000 est. value
Hendersonville, TN 37075

Spring Hill High School Conversion to Elementary School
Build-out, Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Columbia, TN 38401

Northwest Elementary School Construction - Knox County
New Construction
Conception
$8,950,000 est. value
Knoxville, TN

Last Updated 08/05/2022 05:31 PM
Project Title

New Breezeway Security Screening for Town Acres Elementary School

Physical Address View project details and contacts
City, State (County) Johnson City, TN 37604   (Washington County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $379,700 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bids must be accompanied by Bid security as specified in the Instructions to Bidders. All Bidders must be licensed Contractors as required by the Contractors Licensing Act of 1994 (TCA Title 62, Chapter 6). A contract will not be awarded to a Bidder whose Bid is in conflict with state licensing law. The Contractor shall comply with all provisions of TCA 50-9-113 as it relates to Drug-Free Workplace requirements. The Contractor shall complete the Drug-Free Workplace Affidavit of Prime Bidder form and submit it with their bid. The Contract(s) shall be awarded to the lowest responsive and responsible Bidder(s). The Owner reserves the right to reject any and all Bids if it appears in its best interest to do so.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents