Similar Projects
General Construction
Term Contract
Post-Bid
MN

Red River Valley Juvenile Center
Renovation
Design
$900,000 est. value
Crookston, MN 56716

Northwest Minnesota Juvenile Center
New Construction
Post-Bid
Bemidji, MN 56601

Winona County Jail - Detention Equipment Package
New Construction, Alteration
Post-Bid
Winona, MN 55987

Community Corrections Lobby Upgrades
Renovation
Results
$185,000 est. value
Apple Valley, Hastings, West Saint Paul, MN 55124

New Winona County Jail Building
New Construction
Post-Bid
Winona, MN 55987

Construction Manager - Rice County Jail and Law Enforcement Center
New Construction
Post-Bid
$49,000,000 est. value
Faribault, MN 55021

ACF Men's Campus Updates
Renovation
Results
Plymouth, MN 55447

Carlton County Jail
New Construction - 55,200 SF
Design
$34,000,000 est. value
Carlton, MN 55718

Replace Two Elevators at MCF - General
Renovation
Results
$944,835 est. value
Moose Lake, MN 55767

Law Enforcement Center 3100 & 7100 Cell Block Upgrade
Renovation
Results
$500,000 est. value
Hastings, MN 55033

Last Updated 02/22/2022 06:03 AM
Project Title

Building Improvements MCF - Togo

Physical Address View project details and contacts
City, State (County) Cook, MN 55723   (Itasca County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $931,181
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Exterior and interior renovations to the Administration building consisting of window and siding replacement, reconfiguration of interior layout to add a control room, replacement of interior finishes and replacement of existing toilet room features. 2. Replacement of EPDM roof system and removal of existing skylights on Barracks #1 3. Replacement of existing ballasted EPDM roof system on Gym foyer with fully adhered EPDM roof system. 4. Removal of existing skylights and replacement of existing shingles on Gym roof. 5. Replacement of roofing system on Pump houses 1 & 3.

Details

Prison/Jail, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents