Similar Projects
Waste Water Lift Station Pump and Grinder Replacement
Renovation
Bidding
Black Hawk, CO 80422

Roxborough Lift Station Pump P-201 Replacement
Renovation
Bidding
$200,000 est. value
Littleton, CO 80125

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

VCC Lift Station Design-Build Rehabilitation
Post-Bid
Aurora, CO 80016

WWTF Headworks and Lift Station Rehabilitation
Results
Less than $408,900 est. value
Lamar, CO 81052

Washington Street Stormwater Lift Station
Results
Less than $530,750 est. value
Lamar, CO 81052

The Bijou Subdivision Phase 1
Infrastructure
Bidding
Bellvue, CO 80512

Piney Creek Lift Station Upgrades
Renovation
Post-Bid
$2,500,000 to $2,700,000 est. value
Aurora, CO 80016

29th Street Pump Station
Results
$2,000,000 to $3,000,000 est. value
Pueblo, CO

South St. Vrain Creek Pipeline Pump Station Construction
Renovation
Post-Bid
Longmont, Lyons, CO 80540

South Street Vrain Creek Pipeline Packaged Pump Station Equipment Package
Results
Longmont, CO

Quail Dunes Golf Course Pump Station Replacement
New Construction, Infrastructure
Post-Bid
Fort Morgan, CO

Santa Rita Pump Station MCC Installation
Results
CO

Dowd Junction Lift Station 4 and Force Main Replacement
New Construction, Alteration
Post-Bid
Eagle, CO

CTF TCF Water Pump Skid Repl. Dq1 GC CMS165046
Results
Less than $60,000 est. value

Reported 04/29/2022 12:00 AM
Project Title

Construction Management/General Contractor (CMGC) Selection for the Alkire Lift Station Improvements Project

Physical Address View project details and contacts
City, State (County) Westminster, CO 80005   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

From qualified vendors for Construction Management/General Contractor (CMGC) preconstruction services for improvements to an existing sanitary sewer lift station, Alkire.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents